Loading AI tools
Highway in Virginia From Wikipedia, the free encyclopedia
Interstate 64 (I-64) in the US state of Virginia runs east–west through the middle of the state from West Virginia to the Hampton Roads region, for a total of 299 miles (481 km). From the West Virginia state line to Chesapeake, it passes through the major cities of Lexington, Staunton, Charlottesville, the state capital of Richmond, Newport News, Hampton, and Norfolk. It is notable for crossing the mouth of the harbor of Hampton Roads on the Hampton Roads Bridge–Tunnel (HRBT), the first bridge–tunnel to incorporate artificial islands, concurrent with U.S. Route 60 (US 60). Also noteworthy is a section through Rockfish Gap, a wind gap in the Blue Ridge Mountains, which was equipped with an innovative system of airport-style runway lighting embedded into the pavement to aid motorists during periods of poor visibility due to fog or other conditions.
Purple Heart Trail | ||||
Route information | ||||
Maintained by VDOT | ||||
Length | 299.45 mi[1][2] (481.92 km) | |||
Existed | 1957–present | |||
NHS | Entire route | |||
Major junctions | ||||
West end | I-64 / US 60 at West Virginia state line | |||
East end | I-264 / I-664 in Chesapeake | |||
Location | ||||
Country | United States | |||
State | Virginia | |||
Counties | Alleghany, City of Covington, Rockbridge, Augusta, City of Waynesboro, Nelson, Albemarle, City of Charlottesville, Fluvanna, Louisa, Goochland, Henrico, City of Richmond, New Kent, James City, York, City of Newport News, City of Hampton, City of Norfolk, City of Virginia Beach, City of Chesapeake | |||
Highway system | ||||
|
I-64 enters Virginia as a four-lane divided highway, continuing its concurrency with US 60 through Covington into Lexington where the two routes split. From Lexington, I-64 then turns northward to Staunton, overlapping I-81 in the Shenandoah Valley. From Staunton, I-64 leaves I-81, passes through Waynesboro, crosses Rockfish Gap, and continues eastward, passing just to the south of Charlottesville, closely following the path of the historic colonial-era Three Notch'd Road, which had been established in the Colony of Virginia by the 1730s and was largely replaced in the 1930s by US 250.[3] Just outside of Charlottesville in Zion Crossroads, I-64 received the state's first diverging diamond interchange at its interchange with US 15, which opened to traffic on February 21, 2014, and was completed on April 15, 2014.[4][5][6]
After Charlottesville, I-64 then turns more east-southeasterly and heads toward Richmond, passing through Fluvanna, Goochland, and Louisa counties. After entering Henrico County and the Greater Richmond Region, I-64 interchanges and overlaps with I-95 on a stretch of highway which was a part of the former Richmond–Petersburg Turnpike, passing near Downtown Richmond and through the historic Black neighborhood of Jackson Ward. Once on the south side of Downtown Richmond, I-64 diverges from its concurrency with I-95 and continues southeasterly down the Virginia Peninsula through New Kent County and the Historic Triangle, into Newport News.
This portion of I-64 was set up by the Virginia Department of Transportation (VDOT) with a contraflow lane reversal system in place in the event of a mass evacuation of the Hampton Roads area region due to a hurricane or other catastrophic event. Gates are installed at the eastbound I-64 entrance and exit ramps from exit 200 (I-295) to exit 273 (US 60 east of the HRBT), and crossover roads are in place near the aforementioned exits.[7]
About a mile (1.6 km) before the southern interchange with State Route 199 (SR 199), I-64 becomes a six-lane divided highway as it continues toward Hampton Roads. Shortly after entering its interchange with SR 173 (Denbigh Boulevard), I-64 enters the Hampton Roads metropolitan area and widens out to an eight-lane divided highway, continuing generally south-southeasterly into Hampton where it meets the northern terminus of I-664 beginning the Inner Loop of the Hampton Roads Beltway. I-64 curves north-northeast to pass north of Downtown Hampton and cross the Hampton River, turning back southward to reach the Hampton Roads Bridge–Tunnel, which it utilizes to cross the main shipping channel at the entrance to the harbor of Hampton Roads from the Chesapeake Bay. Once on the Southside, I-64 turns south through Norfolk, passing the eastern boundary of Naval Station Norfolk and Chambers Field and the spur route supplying it, I-564. It then becomes a six-lane divided highway with a two-lane reversible roadway in the middle, which is used for HOV traffic during morning and afternoon rush hours. It continues through Norfolk, curving multiple times and eventually ending up heading due south as it passes the interchange with another of its spur routes, I-264 on the northwest side of Virginia Beach.
After I-264, there are no more directional markers on I-64 from here to its "eastern" terminus because I-64 "east" will actually head west after its current southward course, and vice-versa. From I-264 to its "eastern" terminus, it is simply only signed as I-64 and either the Inner and Outer loop of the Hampton Roads Beltway.
Shortly after the I-264 interchange, I-64 leaves Virginia Beach for the city of Chesapeake. It soon comes to a complex interchange between another of its spur routes, I-464, along with US 17 and SR 168. I-64, now running westward, crosses the Southern Branch Elizabeth River using the High Rise Bridge. The road then curves northwesterly and ends at Bower's Hill, where it meets both the western terminus of I-264 and the southern terminus of I-664 near the northeastern corner of the Great Dismal Swamp. I-64's lanes continue northbound as I-664 to Newport News across the Monitor–Merrimac Memorial Bridge–Tunnel (MMMBT), ending at I-64 in Hampton, completing the beltway.
This section needs expansion. You can help by adding to it. (August 2023) |
In early studies and proposals of the Interregional Highway System (the predecessor title of the Eisenhower Interstate System), I-64 was to use the US 250 alignment west of Richmond.[8][9][10][11] However, in the late 1950s, a number of interested citizens, including Virginia Senator Mosby Perrow Jr., proposed that I-64 be realigned to run along US 220, US 460, SR 307, and US 360 from Clifton Forge via Cloverdale (near Roanoke), Lynchburg, and Farmville to Richmond. This southern route was favored by Governor J. Lindsay Almond and most members of the State Highway Commission.
The decision was on hold for three years while the state continued planning for the piece of the US 250 alignment from Richmond to Short Pump, which would be needed anyway to handle traffic.[12] In 1961, US Secretary of Commerce Luther H. Hodges rejected that plan and chose the present route, leaving Lynchburg as the largest city in Virginia not served by an Interstate. Officially, the chosen route was considered more efficient. However, there is speculation that the decision involved "back-room" politics of the Kennedy administration.[13]
I-64 has four auxiliary routes, all of which are in the Hampton Roads Area:
Both of the bypass routes are shorter than the main leg for through traffic—I-664 is about 15 miles (24 km) shorter than the bypassed main leg while I-264 is about a mile (1.6 km) shorter than the main leg it bypasses.
On December 22, 2019, around 69 cars were involved in a pileup on I-64 westbound at the Queen's Creek Bridge near exit 238 (SR 143 east). 51 injuries were reported, including two life-threatening. Per reports, ice and fog were seen at that time.[14][15]
Two segments on I-64 have been identified as candidates for widening: I-64 on the Virginia Peninsula from New Kent County to Newport News and I-64 in South Hampton Roads from the I-464/US 17/SR 168 interchange in Chesapeake to the Bowers Hill Interchange in Suffolk.
Peninsula
On the Peninsula, most of the I-64 corridor is a four-lane roadway and is one of the most-traveled segments in the region, connecting the Hampton Roads metropolitan area to the Greater Richmond Region. In recent years, the corridor has become a major bottleneck for traffic, with over half of the entire 75-mile (121 km) stretch having failing or near failing levels of service and continued increased safety concerns.[16] In 2011, VDOT initiated a study that would consider widening the highway with either additional general purpose lanes in the median and/or on the outside shoulder, adding two-lane, fully reversible managed lanes (either as a tolled express lane or an HOT-lane facility) or the addition of full tolling on the entire span.[17] The approved plan selected by VDOT and partners included the plan that added an additional general purpose lane in each direction by either expanding into the median or on the outside shoulder.[18] In June 2013, the Commonwealth Transportation Board (CTB) included $100 million (equivalent to $129 million in 2023[19]) in funding for the project in its Six-Year Improvement Program, allowing the project to move forward into the design and build phases. The Hampton Roads Transportation Planning Organization (HRTPO) allocated an additional $44 million (equivalent to $54.8 million in 2023[19]) to Segment I of the project to extend the boundaries beyond the Fort Eustis interchange.[20] The project is broken down into three operationally independent segments, which are independently funded, designed and built by a different company.
Southside
Similar to I-64 west of Newport News on the Peninsula, VDOT and the HRTPO undertook environmental and preliminary engineering studies for the improvement of the eight-mile (13 km), 48-year-old corridor of the I-64 from I-464 in Chesapeake to the Bower's Hill Interchange. This included replacing the functionally obsolete High Rise Bridge, which was completed one year after the study corridor opened, in 1969.
This study, completed in 2013, showed that the corridor frequently performed at near-failing levels of service (level of service grades D and E), with the High Rise Bridge itself outright failing, resulting in higher crash rates when compared to other areas in the region.[24] This is because most of the interchange ramps were built to previous Interstate standards and were based on then-rural development in the Western Chesapeake and Eastern Suffolk.[25] In addition, since the start of tolling at the Elizabeth River Tunnels, the High Rise Bridge and the corridor has received a nearly seven-percent increase in traffic during peak hours, further exacerbating the problem.[26]
In March 2015, the CTB identified and approved of the addition of two lanes of capacity in each direction,[27] with the possibility of them being either two HOT lanes, one HOV and one general-purpose lane, or all four lanes being tolled. Widening would be accomplished by adding the lanes in the median east of US 17 and to the outside shoulder west of US 17.[28] The approved plan also calls for the construction of a new, four-lane 135-foot (41 m) fixed-span bridge to the south of the current High Rise Bridge. Construction will be conducted in multiple phases, similar to the widening project on the Peninsula:
Once completed, the entire corridor would be an eight-lane stretch of highway, with two 135-foot (41 m) fixed-span bridges. Estimated costs for the entire project are currently estimated at $2.3 billion.[28] Currently, only part of first phase of the plan has been funded, which includes preliminary engineering and right-of-way service. A final design for the project is expected in December 2016, and a final contract award date is tentatively scheduled for August 2017.[30]
State and regional leaders have come up to convert the region's 32 miles (51 km) of existing high occupancy vehicle (HOV-2) lanes into high occupancy toll (HOT-2) lanes called the I-64 Express Lanes. According to a 2016 study by VDOT, only 1,600 vehicles travel through the Norfolk HOV lanes during the morning HOV restriction (6:00–8:00 am) and only 1,300 vehicles through the lanes through Virginia Beach and Chesapeake.[31] The plans for the I-64 Express Lanes have been divided into individual segments, all of which have been endorsed by the regions transportation planning organization.
Segment 1 converted the two-lane reversible roadway in Norfolk between the I-64/I-564 interchange and the I-64/I-264 interchange to HOT-2 lanes. Inner Loop traffic (eastbound from Hampton through Norfolk) enters through the ramp just prior to the I-564 interchange and exits through either the left exit directly to I-264 east, the slip ramp back to the Inner Loop for the interchange to I-264 west, or continue straight into mainline Inner Loop on the other side of the interchange. Outer Loop (westbound from Chesapeake to Norfolk) traffic enters the lanes at the ramp just after the I-64 Twin Bridges at the Elizabeth River, I-264 west traffic (from Virginia Beach to Downtown Norfolk) uses the flyover ramp from mainline I-264 to the Express Lanes, and I-264 east traffic (from Downtown Norfolk to Virginia Beach) merges onto the Outer Loop and utilizes the slip ramp entry. Tolling is only operational from Monday–Friday from 5:00–9:00 am and from 2:00–6:00 pm. Minimum toll during these periods is $0.50 and increases proportionally to traffic. Toll gantry installation and conversion was completed January 10, 2018, slightly behind schedule.[32]
Segment 2 would convert the single HOV-2 diamond lanes in each direction to HOT-2 lanes and would also include the newly expanded High Rise Bridge and associated lanes of I-64 from the I-464/I-64 interchange. Both directions would have a primary entrance/exit near the Bowers Hill interchange, with a midpoint entrance/exit near the Greenbrier Parkway/Battlefield Boulevard interchanges and a terminal entrance/exit that ties in at the Twin Bridges. The current HOV lanes would be reduced from 16 to 12 feet (4.9 to 3.7 m) (allowing the installation of the tubular road markers separating the general purpose lanes from the tolled express lanes), and new 12-foot (3.7 m) lanes would be built extend across the I-64/I-464 interchange and be built into the new High Rise Bridge and all the way to the Bower's Hill interchange. These lanes would be continuously operational once activated and would be variably priced depending on the traffic in the general-purpose lanes. This segment is scheduled to be completed as part of the High Rise Bridge project, which is scheduled for completion in 2021.[31]
Segment 3 would be built as part of the HRBT Expansion Project and would build from the existing reversible HOV northern terminus at I-564/I-64 through, across the expanded bridge–tunnel, and through the existing HOV-2 diamond lanes in Hampton. Planning for this segment (such as operational times and tolling pricing) will continue as the HRBT Expansion Project continues and would open at the same time as the new HRBT opens in 2024.[31]
Segment 4 would convert the remaining diamond lanes on I-64 in Hampton & Newport News to HOT-2 lanes as an extension of the HRBT Expansion Project. Detailed studies for this project, including operational hours, planning, and design, will occur in 2018 and would open along with the completion of the HRBT Expansion Project.
According to VDOT, in 1958, an average of 6,000 vehicles a day used the facility whereas an average of 88,000 vehicles a day were using the crossing in 2008, with volumes exceeding 100,000 during the tourist season, well exceeding the original design capacity of 77,000 vehicles per day, which sparked decades of debate on how to improve traffic flow at the region's most important water crossing. Studies into the growing traffic at the HRBT have roots back to the early 1990s. In 1992, the Virginia General Assembly had requested that VDOT study growing traffic at the HRBT. The conclusion of that study determined that a longterm large-scale solution to the problem would be required to alleviate backups. For the next 14 years, VDOT would undertake numerous studies in 1999, 2008, 2012, and 2016 to help choose a candidate build that was financially and physically feasible to build. On October 29, 2020, a groundbreaking ceremony was held in Hampton for the HRBT Expansion Project.[33]
After nearly two decades of studies and planning, the CTB and the two regional boards responsible for the project (HRTPO/Hampton Roads Transportation Accountability Commission (HRTAC)) voted unanimously in 2016 to a $3.3-billion expansion of the current bridge–tunnel and its approaches from two to four lanes in both directions from the I-664 interchange to the I-564 interchange, with two new, two-lane bridge–tunnels built to carry traffic eastbound (Hampton to Norfolk). A final environmental impact statement (EIS) was published in May 2017, and the Record of Decision (ROD) from the Federal Highway Administration (FHWA) was granted in June. The project is expected to be completed by November 2025 [33]
County | Location | mi[1] | km | Old exit[34][35] | New exit | Destinations | Notes | |
---|---|---|---|---|---|---|---|---|
Alleghany | | 0.00 | 0.00 | I-64 west / US 60 west – White Sulphur Springs | Continuation into West Virginia | |||
| 1.83 | 2.95 | 1 | Jerry's Run Trail | ||||
| 2.47 | 3.98 | Virginia Welcome Center (eastbound only) | |||||
| 7.16 | 11.52 | 2 | 7 | SR 661 (Ogle Creek Road) | Eastbound exit and westbound entrance | ||
Callaghan | 10.01 | 16.11 | 3 | 10 | US 60 east (Midland Trail) / SR 159 south (Dunlap Creek Road) to SR 311 – Callaghan | East end of concurrency with US 60 | ||
City of Covington | 14.84 | 23.88 | 4 | 14 | SR 154 north (Durant Road) – Covington, Hot Springs | |||
Alleghany | Mallow | 16.68 | 26.84 | 5 | 16 | US 60 west / US 220 north – Covington, Hot Springs, WESTVACO Trailer Lot | West end of concurrencies with US 60 and US 220; signed as exits 16A (US 60 / US 220) and 16B (WESTVACO Trailer Lot) westbound | |
| 21.49 | 34.58 | 6 | 21 | SR 696 (Selma Low Moore Road) – Low Moor | |||
Selma | 23.86 | 38.40 | 7 | 24 | US 60 Bus. east / US 220 Bus. south (Ridgeway Street) / SR 384 west (Dabney S. Lancaster Community College Road) – Clifton Forge | |||
Cliftondale Park | 27.49 | 44.24 | 8 | 27 | US 220 south / US 60 Bus. west (Grafton Street) / SR 629 north (Douthat State Park Road) – Clifton Forge | East end of concurrency with US 220 | ||
| 29.27 | 47.11 | 9 | 29 | SR 42 north / SR 269 east (Forty Two Road) | |||
Longdale Furnace | 35.65 | 57.37 | 10 | 35 | SR 269 west (Longdale Furnace Road) / SR 850 east (North Mountain Road) – Longdale Furnace | |||
Rockbridge | | 42.91 | 69.06 | 11 | 43 | SR 780 (Scenic Drive) – Goshen | ||
| 50.29 | 80.93 | 12 | 50 | US 60 east / SR 623 (Fredericksburg Road) | East end of concurrency with US 60 | ||
East Lexington | 55.68 | 89.61 | 13 | 55 | US 11 (Lee Highway) to SR 39 – Lexington, Goshen | |||
| 56.66 | 91.19 | 14 | 56 | I-81 south – Roanoke | I-81 exit 191; west end of concurrency with I-81 | ||
| 60.53 | 97.41 | 53 | 195 | US 11 (Lee Highway) – Lexington | Exit numbers follow I-81 | ||
Fairfield | 66.10 | 106.38 | 53A | 200 | SR 710 (Sterrett Road) – Fairfield | |||
Raphine | 70.59 | 113.60 | 54 | 205 | SR 606 (Raphine Road) – Raphine, Steeles Tavern | |||
Augusta | Greenville | 78.62 | 126.53 | 55 | 213 | US 11 (Lee Highway) to US 340 – Greenville | Split into exits 213A (south) and 213B (north) westbound | |
Mint Spring | 83.36 | 134.15 | 55A | 217 | SR 654 (White Hill Road) – Mint Spring, Stuarts Draft | |||
Jolivue | 85.83 | 138.13 | 55B | 220 | SR 262 (Woodrow Wilson Parkway) to US 11 – Staunton | |||
87.14 | 140.24 | 15 | 87 | I-81 north – Staunton, Winchester | I-81 exit 221; east end of concurrency with I-81; exit numbers follow I-64 | |||
Fishersville | 91.28 | 146.90 | 16 | 91 | SR 285 (Tinkling Spring Road) to SR 608 – Fishersville, Stuarts Draft | |||
City of Waynesboro | 94.62 | 152.28 | 17 | 94 | US 340 (Rosser Avenue) – Waynesboro, Stuarts Draft | |||
96.57 | 155.41 | 18 | 96 | SR 624 (Delphine Avenue) – Waynesboro, Lyndhurst | ||||
Augusta | | 99.58 | 160.26 | 19 | 99 | US 250 (Three Notch'd Mountain Highway) – Afton, Waynesboro | Access to the Blue Ridge Parkway and Skyline Drive | |
Nelson | Rockfish Gap | Scenic View (eastbound only) | ||||||
Albemarle | Yancey Mills | 107.22 | 172.55 | 20 | 107 | US 250 (Rockfish Gap Turnpike) – Crozet, Yancey Mills | ||
| 114.13 | 183.67 | 21 | 114 | SR 637 (Dick Woods Road) – Ivy | |||
| 118.38 | 190.51 | 22 | 118 | US 29 (Monacan Trail Road) – Charlottesville, Culpeper, Lynchburg | Signed as exits 118A (south) and 118B (north) | ||
| 119.87 | 192.91 | 23 | 120 | SR 631 (5th Street) – Charlottesville | |||
| 121.60 | 195.70 | 24 | 121 | SR 20 (Scottsville Road) – Charlottesville, Scottsville | Signed as exits 121A (south) and 121B (north) eastbound | ||
City of Charlottesville | ||||||||
Albemarle | | 124.32 | 200.07 | 25 | 124 | US 250 (Richmond Road) – Charlottesville, Shadwell | Diverging Diamond Interchange | |
| 129.74 | 208.80 | 26 | 129 | SR 616 (Black Cat Road) – Keswick, Boyd Tavern | |||
Fluvanna |
No major junctions | |||||||
Louisa | Zion Crossroads | 136.73 | 220.05 | 27 | 136 | US 15 (James Madison Highway) – Gordonsville, Palmyra | Diverging diamond interchange | |
Ferncliff | 143.05 | 230.22 | 28 | 143 | SR 208 (Courthouse Road) – Louisa, Ferncliff | |||
Goochland | Shannon Hill | 148.82 | 239.50 | 29 | 148 | SR 605 (Shannon Hill Road) – Shannon Hill | ||
| 152.74 | 245.81 | 30 | 152 | SR 629 (Old Fredericksburg Road) – Hadensville | |||
Louisa | Gum Spring | 159.43 | 256.58 | 31 | 159 | US 522 (Cross County Road) – Gum Spring, Goochland, Mineral | ||
Goochland | Oilville | 167.31 | 269.26 | 32 | 167 | SR 617 (Oilville Road) – Oilville, Goochland | ||
| 173.87 | 279.82 | 33 | 173 | SR 623 (Ashland Road) – Rockville, Manakin | |||
| 175.06 | 281.73 | 175 | SR 288 south (World War II Veterans Memorial Highway) – Chesterfield | Opened in 2003 | |||
Henrico | Short Pump | 177.98 | 286.43 | 34 | 177 | I-295 to I-95 – Washington, Norfolk, Airport | I-295 exit 53; left exit eastbound; trumpet interchange | |
| 178.85 | 287.83 | 35 | 178 | US 250 (Broad Street) – Short Pump | Signed as exits 178A (west) and 178B (east) | ||
| 180.28 | 290.13 | 36 | 180 | Gaskins Road | Signed as exits 180A (south) and 180B (north) | ||
| 181.67 | 292.37 | 37 | 181 | Parham Road | Signed as exits 181A (south) and 181B (north) westbound | ||
| 183.70 | 295.64 | 38 | 183 | US 250 (Broad Street) / Glenside Drive | Signed as exits 183A (Glenside Drive south), 183B (US 250 east), and 183C (US 250 west / Glenside Drive north) westbound | ||
Dumbarton | 185.73 | 298.90 | 39 | 185 | US 33 (Staples Mill Road) / Staples Mill Parkway | Signed as exits 185A (Staples Mill Parkway to US 33 west) and 185B (east) eastbound | ||
City of Richmond | 187.07 | 301.06 | 40 | 186 | I-195 south / SR 197 (Laburnum Avenue) / to Powhite Parkway – Downtown Richmond | Eastbound exit to and westbound entrance from Laburnum Avenue | ||
187.31 | 301.45 | 41 | 187 | I-95 north (Richmond–Petersburg Turnpike) – Washington | I-95 exit 79; west end of concurrency with I-95 | |||
188.14 | 302.78 | 14 | 78 | SR 161 (Boulevard) | Exit numbers follow I-95 | |||
190.33 | 306.31 | 13B | 76B | US 1 / US 301 (Belvidere Street) | No westbound exit | |||
190.56 | 306.68 | 13A | 76A | US 1 / US 301 (Chamberlayne Avenue) | Westbound exit and eastbound entrance | |||
190.86 | 307.16 | 43 | 190 | I-95 south (Richmond–Petersburg Turnpike) / 3rd Street / 5th Street – Petersburg, Downtown Richmond, Coliseum, Convention Center | I-95 exit 75; east end of concurrency with I-95; eastbound exit is for 3rd Street; westbound exit is for 5th Street; eastbound and westbound entrances are from 7th Street; exit numbers follow I-64 | |||
192.53 | 309.85 | 44 | 192 | US 360 (Mechanicsville Turnpike) – Mechanicsville | ||||
Henrico | | 193.89 | 312.04 | 45 | 193 | SR 33 (Nine Mile Road) | Signed as exits 193A (west) and 193B (east) | |
Montrose | 196.03 | 315.48 | 46 | 195 | SR 197 (Laburnum Avenue) | |||
Sandston | 197.91 | 318.51 | 47 | 197 | SR 156 (Airport Drive) – Highland Springs, Sandston, Richmond International Airport | Formerly signed as exits 197A (south) and 197B (north). Loops B & D were removed in 2019. | ||
| 201.98 | 325.06 | 48 | 200 | I-295 / US 60 – Rocky Mount, NC, Washington | I-295 exit 28 | ||
New Kent | Bottoms Bridge | 206.01 | 331.54 | 49 | 205 | SR 33 west / SR 249 east (New Kent Highway) to US 60 – Bottoms Bridge, Quinton | West end of concurrency with SR 33 | |
| 211.44 | 340.28 | 50 | 211 | SR 106 (Emmaus Church Road) – Talleysville, Roxbury | |||
| 214.91 | 345.86 | 51 | 214 | SR 155 (Courthouse Road) – New Kent Courthouse, Providence Forge | |||
| 220.60 | 355.02 | 52 | 220 | SR 33 east (Eltham Road) – West Point | East end of concurrency with SR 33 | ||
James City | | 227.34 | 365.87 | 53 | 227 | SR 30 (Old Stage Road) to US 60 – West Point, Toano, Williamsburg | ||
| 231.62 | 372.76 | 54 | 231 | SR 607 (Croaker Road) to SR 30 – Croaker, Norge, Toano | Signed as exits 231A (Norge) and 231B (Croaker) | ||
York | | 234.46 | 377.33 | 55 | 234 | SR 199 east (Humelsine Parkway) / SR 646 west (Newman Road) – Lightfoot | Signed as exits 234A (SR 199) and 234B (SR 646) westbound | |
| 239.17 | 384.91 | 56 | 238 | SR 143 east (Merrimac Trail) to US 60 – Camp Peary, Colonial Williamsburg | |||
| 242.61 | 390.44 | 57 | 242 | SR 199 (Marquis Center Parkway / Humelsine Parkway) | Signed as exits 242A (west) and 242B (east) | ||
| 244.23 | 393.05 | 58 | 243 | To US 60 (Pocahontas Trail) / SR 143 west (Merrimac Trail) – Busch Gardens, Williamsburg | Split into exits 243A (US 60) and 243B (SR 143); no access to eastbound SR 143 or from SR 143 | ||
James City | | 246.86 | 397.28 | 59 | 247 | SR 143 (Merrimac Trail) to SR 238 – Yorktown, Lee Hall | Exit ramp from eastbound I-64 to SR 143 and entrance ramps from eastbound SR 143 to eastbound I-64 and from westbound SR 143 to westbound I-64 | |
City of Newport News | 248.48 | 399.89 | SR 238 (Yorktown Road) – Yorktown, Lee Hall | Westbound exit and eastbound entrance | ||||
250.52 | 403.17 | 60 | 250 | SR 105 (Fort Eustis Boulevard) – Yorktown, Fort Eustis | Signed as exits 250A (west) and 250B (east) | |||
255.55 | 411.27 | 61 | 255 | SR 143 (Jefferson Avenue) | Signed as exits 255A (east) and 255B (west) | |||
256.96 | 413.54 | 61A | 256 | SR 171 (Victory Boulevard / Oyster Point Road) – Poquoson | Signed as exits 256A (west) and 256B (east) | |||
258.77 | 416.45 | 62 | 258 | US 17 (J. Clyde Morris Boulevard) – Yorktown | Signed as exits 258A (south) and 258B (north) | |||
City of Hampton | 261.80 | 421.33 | 62A-B | 261 | Hampton Roads Center Parkway | No access from westbound I-64 to eastbound Hampton Roads Center Parkway or from westbound Hampton Roads Center Parkway to eastbound I-64; signed as exits 261A (west) and 261B (east) eastbound | ||
263.13 | 423.47 | 63 | 262 | SR 134 north (Neil Armstrong Parkway) / Hampton Roads Center Parkway east – NASA, Poquoson | Westbound exit, eastbound entrance; west end of concurrency with SR 134; signed as exit 262B | |||
263.65 | 424.30 | 64 | 263 | US 258 / SR 134 south (Mercury Boulevard) – Coliseum, James River Bridge | East end of concurrency with SR 134; signed as exits 263A (US 258 south) and 263B (US 258 north / SR 134 south) westbound | |||
264.84 | 426.22 | 65 | 264 | I-664 south (Hampton Roads Beltway south) – Downtown Newport News, Suffolk, Chesapeake | I-664 exit 1; I-64 joins Hampton Roads Beltway | |||
265.61 | 427.46 | 66 | 265A 265A-B | La Salle Avenue SR 134 (Armistead Avenue) / La Salle Avenue | Eastbound signage Westbound signage | |||
67 | 265C | Armistead Avenue (SR 134) – Langley Air Force Base | No westbound exit; formerly signed for Rip Rap Road | |||||
268.12 | 431.50 | 68 | 267 | US 60 west / SR 143 (Settlers Landing Road) / Woodland Road – Hampton University | West end of concurrency with US 60 | |||
268.45 | 432.03 | 69 | 268 | SR 169 east (Mallory Street) – Fort Monroe | ||||
Hampton Roads | 271.93 | 437.63 | Hampton Roads Bridge–Tunnel | |||||
City of Norfolk | 272.54 | 438.61 | 70 | 272 | W. Ocean View Avenue – Willoughby Spit | |||
274.28 | 441.41 | 71 | 273 | US 60 east (4th View Street) – Ocean View | East end of US 60 overlap | |||
275.58 | 443.50 | 72 | 274 | Bay Avenue – Naval Station | Westbound exit and eastbound entrance | |||
276.98 | 445.76 | 73 | 276A 276B | I-564 to SR 406 (Terminal Boulevard) – Naval Base US 460 (Granby Street) | Consolidated into exit 276 eastbound; exit 276B is a left exit; no access from eastbound I-64 to eastbound US 460; access from westbound I-64 to westbound US 460 via exit 276C | |||
♦ | I-64 Express east (HOT Lanes) | Western terminus of HOT lanes; eastbound exit and westbound entrance | ||||||
♦ | I-564 west – Naval Base | Westbound exit and eastbound right entrance for reversible HOT lanes | ||||||
74 | 276C | SR 165 (Little Creek Road) to US 460 west | Westbound exit and eastbound entrance; eastbound access via exit 276 and US 460 | |||||
278.36 | 447.98 | 75 | 277 | SR 168 (Tidewater Drive) | Signed as exits 277A (south) and 277B (north) | |||
279.40 | 449.65 | 76 | 278 | SR 194 (Chesapeake Boulevard) | Westbound exit and entrance only to and from northbound, eastbound exit and entrance only to and from southbound | |||
280.40 | 451.26 | 77 | 279 | SR 247 (Norview Avenue) – Norfolk International Airport | Signed as exits 279A (west) and 279B (east) westbound | |||
281.66 | 453.29 | 78 | 281 | SR 165 (Military Highway) / Robin Hood Road | Signed as exits 281A (Robin Hood Road) and 281B (SR 165 south) eastbound; no eastbound entrance | |||
282.85 | 455.20 | 79 | 282 | US 13 (Northampton Boulevard) – Chesapeake Bay Bridge-Tunnel | No access from northbound US 13 to westbound I-64 | |||
284.59 | 458.00 | 80 | 284 | I-264 (Virginia Beach Expressway) to SR 403 (Newtown Road) – Virginia Beach, Downtown Norfolk, Portsmouth | I-264 exit 14; signed as exits 284A (west) and 284B (east); eastbound exit 284A includes a flyover to I-264 east, so exit 284B is signed only for Newtown Road in that direction; east end of directional (east–west) signage; I-64 east is signed as inner loop (clockwise) and I-64 west is signed as outer loop (counterclockwise). | |||
♦ | I-264 east – Virginia Beach | Inner loop exit and outer loop right entrance for reversible HOT lanes | ||||||
♦ | I-64 Express west (HOT Lanes) | Clockwise terminus of HOT lanes; outer loop exit and inner loop entrance | ||||||
Eastern Branch Elizabeth River | 285.41 | 459.32 | C. Roger Malbon, Sr. Memorial Bridges | |||||
City of Virginia Beach | 287.28 | 462.33 | 81 | 286 | Indian River Road | Signed as exits 286A (west) and 286B (east) | ||
City of Chesapeake | 289.83 | 466.44 | 82 | 289 | Greenbrier Parkway | Signed as exits 289A (north) and 289B (south) | ||
291.96 | 469.86 | 83 | 290 | SR 168 north / SR 168 Bus. south (Battlefield Boulevard) – Great Bridge | Signed as exits 290A (north) and 290B (South Business). Outer loop end of concurrency with SR 168 | |||
292.52 | 470.77 | 84 | 291 | I-464 north (Martin Luther King Jr. Expressway) / US 17 south (Dominion Boulevard) / SR 168 south (Oak Grove Connector) – Norfolk, Elizabeth City, Outer Banks | I-464 exit 1; SR 168 exit 15A; no access from outer loop I-64 to southbound US 17; signed as exits 291A (I-464) and 291B (US 17 / SR 168); inner loop end of concurrency with SR 168; outer loop end of concurrency with US 17; signed as exits 291B (SR 168) and 292 (US 17) counterclockwise (outer) | |||
293.25 | 471.94 | 85 | 292 | SR 190 (Great Bridge Boulevard) to US 17 – Elizabeth City | Outer loop exit only | |||
High Rise Bridge over Southern Branch Elizabeth River | ||||||||
296.85 | 477.73 | 86 | 296 | US 17 north / US 17 Bus. south (George Washington Highway) – Deep Creek, Portsmouth | Inner loop end of US 17 overlap; signed as exits 296A (north) and 296B (south) on inner loop | |||
298.31 | 480.08 | 87 | 297 | US 13 / US 460 (Military Highway) | ||||
300.62 | 483.80 | 88A | 299A | I-264 east – Portsmouth, Norfolk | Inner loop exit and outer loop entrance; western terminus of I-264 | |||
88B | 299B | I-664 north (Hampton Roads Beltway north) to US 13 / US 58 / US 460 – Bowers Hill, Suffolk, Newport News | Continuation north | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.