Sentinel-class cutter

United States Coast Guard cutter class From Wikipedia, the free encyclopedia

Sentinel-class cutter

The Sentinel-class cutter, also known as the Fast Response Cutter or FRC due to its program name, is part of the United States Coast Guard's Deepwater program.[2][3][4] At 154 feet (46.8 m), it is similar to, but larger than, the 123-foot (37 m) lengthened 1980s-era Island-class patrol boats that it replaces. Up to 71 vessels are to be built by the Louisiana-based firm Bollinger Shipyards, using a design from the Netherlands-based Damen Group, with the Sentinel design based on the company's Damen Stan 4708 patrol vessel. The Department of Homeland Security's budget proposal to Congress, for the Coast Guard, for 2021, stated that, in addition to 58 vessels to serve the Continental US, they requested an additional six vessels for its portion of Patrol Forces Southwest Asia.[5]

Quick Facts Class overview, General characteristics ...
Sentinel-class cutter
Thumb
The USCGC Benjamin Bottoms in San Francisco
Class overview
NameSentinel class
OperatorsUnited States Coast Guard
Planned67 (possibly up to 71)
Completed58
Active56
Retired1
General characteristics
TypeCutter
Displacement353 long tons (359 t)
Length46.8 m (154 ft)
Beam8.11 m (26.6 ft)
Depth2.9 m (9.5 ft)
Propulsion
Speed28+ knots
Endurance
  • 5 days, 2,500 nautical miles (4,600 km; 2,900 mi)
  • Designed to be on patrol 2,500 hours per year
Boats & landing
craft carried
1 × Cutter Boat – Over the Horizon – Jet-drive
Complement4 officers, 20 crew
Sensors and
processing systems
  • L-3 C4ISR suite
  • AN/SPS-78 surface search and navigation radar
  • AN/SPS-50 surface search radar
  • RADA RPS-42 MHR air search radar
  • AN/APX-123(V)1 IFF (ship automation provided by MTU Callosum)
Armament1 × Mk 38 Mod 2 25 mm Machine Gun System (and 4 × crew-served Browning M2 machine guns on some cutters)
Close

Planning and acquisition

Summarize
Perspective

In March 2007, newly appointed United States Coast Guard Commandant Thad Allen announced that the USCG had withdrawn a contract from Lockheed Martin and Northrop Grumman for the construction of an initial flawed design of what would eventually become the Sentinel class.[6][7][8][9] Allen announced that instead of the initial high-tech design Bollinger would build vessels based on an existing design, and the new program would focus more on existing "off-the-shelf" technology.

The design chosen was largely based on the Damen Stan 4708 patrol vessels from the Netherlands firm the Damen Group. The South African government operates three similar 154 ft Lillian Ngoyi-class vessels for environmental and fishery patrol.[10]

In September 2008, Bollinger Shipyards in Lockport, Louisiana, was awarded US$88 million to build the prototype first vessel in its class.[11] That prototype was the first of a projected series of 46.8-meter (154 ft) cutters. In September 2008 the series was expected to comprise a maximum of 24 to 34 cutters[12] but by the time the prototype cutter, which became USCGC Bernard C. Webber, entered service in 2012 the planned number of Sentinel-class cutters had grown to 58. They replaced the 37 remaining aging, 1980s-era 110 ft Island-class patrol boats.[13]

USCGC Bernard C. Webber and all following Sentinel-class vessels are named after enlisted Coast Guard heroes.[14] Bernard C. Webber was launched in April 2011, and commissioned in April 2012 at the Port of Miami. She and five sister ships are stationed in Miami, Florida. The second cohort of six vessels is homeported in Key West, Florida. The third cohort of six vessels is homeported in San Juan, Puerto Rico.[15] As of October 2024, the Coast Guard plans to station most of the Sentinel-class cutters in the United States, but a cohort of six is stationed with the Coast Guard's largest unit outside the United States, Patrol Forces Southwest Asia (PATFORSWA), whose homeport is Bahrain in the Persian Gulf. As many as six more are planned to be stationed in the Indo-Pacific region.[16][17]

A second contract was awarded on December 15, 2009 for an additional three Sentinel-class cutters at a cost of US$141 million. By April 2010 the Coast Guard's contract with Bollinger allowed for the order of up to 34 Sentinel-class cutters at a cost of up to US$1.5 billion. Even then, the Coast Guard was planning to build a total of 58 Sentinel-class cutters. [18]

In September 2013, Marine Link reported that the Coast Guard had placed orders with Bollinger Shipyards for additional cutters, bringing the number of such cutters ordered by then to thirty.[19]

In July 2014, it was announced that the U.S. Coast Guard had exercised a $225 million option at Bollinger Shipyards for construction through 2017 of an additional six Sentinel-class Fast Response Cutters (FRCs), bringing the total number of FRCs under contract with Bollinger to 30. Later that number was increased to 32 cutters.

In May 2016, Bollinger Shipyards announced that the U.S. Coast Guard had awarded it a new contract for building the final 26 Sentinel-class fast-response cutters. That brought to 58 the total number of FRCs that the USCG ordered from Bollinger.[20] Acquiring the 58 cutters was expected to cost the federal government $3.8 billion — an average of about $65 million per cutter.

By June 2016, 38 of the projected 58 FRCs had been ordered and 17 were in service. The Miami and Key West chorts were complete. The 18th fast response cutter, Joseph Tezanos, was delivered to the Coast Guard in Key West, Florida, in June 2016 en route to completing the San Juan cohort.[21]

On August 9, 2018 the Coast Guard exercised its contract option to order six more Sentinel-class cutters. These would be the 45th through 50th cutters of that class. With this order, the total value of orders under the contract grew to almost US$929 million. On August 21 the 30th fast response cutter, Robert Ward, was delivered.[22]

On July 31, 2019 the Coast Guard exercised its contract option to order another six Sentinel-class cutters. These would be the 51st through 56th cutters of that class. With this order, the total value of orders under the contract grew to about US$1.23 billion. Under the contract, the Coast Guard could order as many as 58 cutters, at a total cost of US$1.42 billion. The six new cutters were expected to be delivered starting in late 2022 and ending in late 2023.[23]

In September 2020, the Coast Guard announced it was ordering four more FRCs from Bollinger, to be delivered in 2024. These would be the 56th through 60th cutters of that class. At that time, 40 FRCs had been delivered and 38 had been commissioned. The Coast Guard had recently modified its contract with Bollinger to increase the maximum number of cutters that could be ordered under the contract to 64. The modified contract had a potential value of US$1.74 billion.[24]

In 2017, the Coast Guard announced two FRCs would be stationed in Astoria, Oregon starting in 2021.[25] In 2018, the Coast Guard announced four more would be stationed in San Pedro, California in 2018 and 2019.[26] Also in 2018, the Coast Guard revealed plans to eventually homeport a total of six FRCs in Alaska, with one cutter in Sitka, one in Seward, and two in Kodiak, joining two already operating from Ketchikan.[27] Boston, Massachusetts and St. Petersburg, Florida would eventually be FRC homeports.[28][29]

In June 2019, the United States House Committee on Armed Services approved a requirement for the US Navy to study the possibility of buying a version of the FRC, and basing them in Bahrain.[30]

In 2019 Lieutenant Commander Collin Fox (USN), and columnist David Axe suggested that, when the US Navy started to develop unmanned patrol ships to replace the Cyclone class, which are similar in size to the Sentinel class, the hulls and other elements of the robot ships would be based on the Sentinels, and built in the same factory.[31][32]

In August 2021, the Coast Guard exercised its option to order four more Sentinel-class cuttersthe 61st through 64thfrom Bollinger. Bollinger planned to build the ships at Bollinger's Lockport, Louisiana facility[33] and deliver the first of the four vessels in the fall of 2024 and the last in the summer of 2025.[34]

In 2022, the Coast Guard awarded a $30 million contract to install a fixed pier and two floating docks to accommodate FRCs at East Tongue Point in Oregon. The first new cutter is expected to arrive at Astoria, Oregon in March 2024 rather than in 2021 as originally planned.[35]

In March 2022, President Joe Biden signed the Consolidated Appropriations Act for Fiscal Year 2022, which provided $130 million in funding for two additional FRCs, bringing the total number to 66.[36][37] In August 2022, the Coast Guard exercised its contract option for the first of these additional cutters, to be delivered by Bollinger in 2025.[38] This order expanded the total value of the Phase 2 contract with Bollinger Shipyards to US$1.8 billion.[39]

On May 8, 2024 the Coast Guard exercised a contract option for two additional FRCs, bringing the total vessels built by or under contract with Bollinger to 67[40] and the total value of the Phase 2 contract to about US$2 billion. The two new FRCs are expected to be delivered in fiscal year 2028.[41]

Mission

The vessels perform various Coast Guard missions which include but are not limited to PWCS (Ports, Waterways, and Coastal Security), Defense Operations, Maritime Law Enforcement (Drug/migrant interdiction and other Law Enforcement), Search and Rescue, Marine Safety, and environment protection.[42]

Design and construction

Summarize
Perspective
Thumb
A graphic of USCG Sentinel-class cutter modifications made to the Damen Stan 4708 patrol vessel design
Thumb
USCGC Raymond Evans, the tenth Sentinel-class cutter

The vessels are armed with a remote-control Mark 38 25 mm Machine Gun System and four crew-served .50-caliber (12.7 mm) M2HB heavy machine guns. They have a bow thruster for maneuvering in crowded anchorages and channels. They have small underwater fins, for coping with the rolling and pitching caused by large waves. They are equipped with a stern launching ramp, like the Marine Protector-class and the eight failed expanded Island-class cutters. They are manned by a crew of 22. The Fast Response Cutter deploys the 26-foot (7.9 m) Cutter Boat - Over the Horizon (OTH-IV) for rescues and interceptions.[43]

Modifications to the Coast Guard vessels from the Stan 4708 design include an increase in speed from 23 to 28 knots (43 to 52 km/h; 26 to 32 mph), fixed-pitch rather than variable-pitch propellers, stern launch capability, and watertight bulkheads.[44] The vessels are built to ABS High Speed Naval Craft rules and some parts of the FRC also comply to ABS Naval Vessel Rules.[45] The vessels meet Naval Sea Systems Command standards for two compartment damaged stability and meet the Intact and Damage Stability and reserve buoyancy requirements in accordance with the “Procedures Manual for Stability Analyses of U.S. Navy Small Craft".[46][47]

The vessels have space, weight, and power reserved for future requirements which includes weapons and their systems. The cutters have a reduced radar cross-section through shaping.[48] The bridge is equipped with a handheld device that allows crew members to remotely control the ship's functions, including rudder movement and docking.[49]

In February 2013, the Department of Homeland Security requested tenders from third party firms to independently inspect the cutters, during their construction, and their performance trials.[50]

At the September 2022 commissioning of USCGC Douglas Denman, it was announced that she had several upgrades compared to the two cutters deployed to Ketchikan, Alaska six years previously. These include an improved bow thruster and radar system and the addition of a forward-looking infrared camera.[51] Though initially stationed at Ketchikan, Douglas Denman will eventually be homeported at Sitka when port infrastructure improvements have been completed there.[52]

In March 2024, a Congressional Research Service report revealed that the Coast Guard's long term procurement plan called for the purchase of up to 71 FRCs. Six of the new cutters would be deployed to the Indo-Pacific region for engagement with allies and partner countries.[53]

Crew accommodation

Prior to the deployment of the Marine Protector class, the Coast Guard decided that all its cutters, even its smallest, should be able to accommodate mixed-gender crews. The Sentinel-class cutters are able to accommodate mixed-gender crews. When USCGC Rollin Fritch was commissioned, a profile in The Philadelphia Inquirer asserted off-duty crew members had access to satellite television broadcasts.[49] The vessels come equipped with a desalination unit.[49]

Ships

More information Name, Hull number ...
NameHull
number
DeliveredCommissionedHome
port
Status
Bernard C. Webber WPC-1101 April 21, 2011 April 14, 2012 Miami, Florida Active service[54]
Richard Etheridge WPC-1102 August 18, 2011 August 3, 2012[55] Miami, Florida Active service[54]
William Flores WPC-1103 2011-11-10 2012-11-03[56] Miami, Florida Active service[54]
Robert Yered WPC-1104 2012-11-17[57] 2013-02-15 Miami, Florida Active service[54]
Margaret Norvell WPC-1105 2013-01-13[58] 2013-06-01[59] Miami, Florida Active service[54]
Paul Clark WPC-1106 2013-05-18[60] 2013-08-24 Miami, Florida Active service[54]
Charles David Jr. WPC-1107 2013-08-17[61][62] 2013-11-16[63] Key West, Florida Active service[54]
Charles Sexton WPC-1108 2013-12-10[64] 2014-03-08[65] Key West, Florida Active service[54]
Kathleen Moore WPC-1109 2014-03-28[66] 2014-05-10 Key West, Florida Active service[54]
Raymond Evans[Note 1] WPC-1110 2014-06-25[67] 2014-09-06[68] Key West, Florida Active service[54]
William Trump WPC-1111 2014-11-25[69][70][71][72] 2015-01-24 Key West, Florida Active service[54]
Isaac Mayo WPC-1112 2015-01-13[73] 2015-03-28[74] Key West, Florida Active service[54]
Richard Dixon WPC-1113 2015-04-14[75] 2015-06-20 San Juan, Puerto Rico Active service[15][54]
Heriberto Hernandez WPC-1114 2015-07-30[76] 2015-10-16 San Juan, Puerto Rico Active service[15][77][54]
Joseph Napier WPC-1115 2015-10-20[78] 2016-01-29 San Juan, Puerto Rico Active service[15][54]
Winslow Griesser WPC-1116 2015-12-23 2016-03-11 San Juan, Puerto Rico Active service[15][54]
Donald Horsley WPC-1117 2016-03-05[79] 2016-05-20 San Juan, Puerto Rico Active service[54]
Joseph Tezanos WPC-1118 2016-06-22 2016-08-26[80] San Juan, Puerto Rico Active service[54]
Rollin Fritch WPC-1119 2016-08-23 2016-11-19 Cape May, New Jersey Active service[54]
Lawrence Lawson WPC-1120 2016-10-20 2017-03-18[81] Cape May, New Jersey Active Service[54]
John McCormick WPC-1121 2016-12-13[82] 2017-04-12[83] Ketchikan, Alaska Active service[54]
Bailey Barco WPC-1122 2017-02-07[84][85] 2017-06-14[86] Ketchikan, Alaska Active service[54]
Benjamin Dailey WPC-1123 2017-04-20[87][88][89] 2017-07-04[90] Decommissioned[91] after being heavily damaged by fire on December 10, 2021.[92]
Oliver Berry WPC-1124 2017-06-27[93] 2017-10-31[94] Honolulu, Hawaii Active service[54]
Jacob Poroo WPC-1125 2017-09-05[95] 2017-12-08[96] Pascagoula, Mississippi Active service[54]
Joseph Gerczak WPC-1126 2017-11-09[97] 2018-03-09[98] Honolulu, Hawaii Active service[54]
Richard Snyder WPC-1127 2018-02-08[99] 2018-04-20[100] Atlantic Beach, North Carolina Active service[54]
Nathan Bruckenthal WPC-1128 2018-03-29[101] 2018-07-25[102] Atlantic Beach, North Carolina Active service[54]
Forrest Rednour WPC-1129 2018-06-07[103] 2018-11-08[104] San Pedro, California Active service[54]
Robert Ward WPC-1130 2018-08-21[105] 2019-03-02[106] San Pedro, California Active service[54]
Terrell Horne WPC-1131 2018-10-25[107] 2019-03-22[108] San Pedro, California Active service[54]
Benjamin Bottoms WPC-1132 2019-01-08[109] 2019-05-01[110] San Pedro, California Active service[54]
Joseph Doyle WPC-1133 2019-03-21[111] 2019-06-08[112] San Juan, Puerto Rico Active service[54]
William Hart WPC-1134 2019-05-23[113] 2019-09-26[114] Honolulu, Hawaii Active service[54]
Angela McShan WPC-1135 2019-08-01[115] 2019-10-26[116] Cape May, New Jersey Active service[54]
Daniel Tarr WPC-1136 2019-11-07[117][118] 2020-01-10[119] Galveston, Texas Active service[120][54]
Edgar Culbertson WPC-1137 2020-02-06[121] 2020-06-11[122] Galveston, Texas Active service[54]
Harold Miller WPC-1138 2020-04-02[123] 2020-07-15[124] Galveston, Texas Active service[120][54]
Myrtle Hazard WPC-1139 2020-05-28[125] 2021-07-29[126] Santa Rita, Guam Active service[54]
Oliver Henry WPC-1140 2020-07-30[127] 2021-07-29[126] Santa Rita, Guam Active service[54]
Charles Moulthrope WPC-1141 2020-10-22[128] 2021-01-21[129] Manama, Bahrain Active service[54]
Robert Goldman WPC-1142 2020-12-21[130] 2021-03-12[131] Manama, Bahrain Active service[54]
Frederick Hatch WPC-1143 2021-02-10[132] 2021-07-29[126] Santa Rita, Guam Active service[54]
Glen Harris WPC-1144 2021-04-22[133] 2021-08-06[134] Manama, Bahrain Active service[54]
Emlen Tunnell WPC-1145 2021-07-01[135] 2021-10-15[136] Manama, Bahrain Active service[54]
John Scheuerman WPC-1146 2021-10-22[137] 2022-02-23[138] Manama, Bahrain Active service[54]
Clarence Sutphin Jr. WPC-1147 2022-01-06[139] 2022-04-21[140] Manama, Bahrain Active service[54]
Pablo Valent WPC-1148 2022-03-17[141] 2022-05-11[142] St. Petersburg, Florida Active service[54]
Douglas Denman WPC-1149 2022-05-26[143][37] 2022-09-28[144] First Ketchikan, then Sitka, Alaska Active service[54]
William Chadwick WPC-1150 2022-08-04[145] 2022-11-10[146] Boston, Massachusetts Active service[54]
Warren Deyampert WPC-1151 2022-12-22[147] 2023-03-30[148] Boston, Massachusetts Active service[54]
Maurice Jester WPC-1152 2023-03-02[149] 2023-06-02[150] Boston, Massachusetts Active service[54]
John Patterson WPC-1153 2023-05-11[151] 2023-08-10[152] Boston, Massachusetts Active service[54]
William Sparling WPC-1154 2023-07-20[153] 2023-10-19[154] Boston, Massachusetts Active service[54]
Melvin Bell WPC-1155 2023-11-16[155] 2024-03-28[156] Boston, Massachusetts Active service[54]
David Duren WPC-1156 2024-03-14[157] 2024-06-27[158] Astoria, Oregon Active service[54]
Florence Finch WPC-1157 2024-06-13[159] 2024-10-24[160] Astoria, Oregon Active Service[160]
John Witherspoon WPC-1158 2024-11-07[161][162] Kodiak, Alaska[54] Delivered
Earl Cunningham WPC-1159 2025 Kodiak, Alaska Under construction[54][163]
Frederick Mann WPC-11602025-04-17[164]First Kodiak, then Seward, AlaskaUnder construction[54]
Olivia Hooker WPC-11612025Under contract[54][34]
Vincent Danz WPC-11622025Under contract[54][34]
Jeffrey Palazzo WPC-11632025Under contract[54][34]
Marvin Perrett WPC-11642025Under contract[54][34]
TBD WPC-11652025Under contract[38]
TBD WPC-1166Under contract[40]
TBD WPC-1167Under contract[40]
Close

Operational histories

Summarize
Perspective
Thumb
Video was released when USCGC William Trump conducted a 20-hour pursuit of a high-speed 35 ft (11 m) center console boat stolen from Fort Myers, Florida, in December 2015.[165][166]

Press coverage of the vessels' operational histories suggests they have been effective at interdicting refugees who resort to dangerous overloaded small boats, and effective at capturing drug smugglers.[167][168][169][170][171][172][173][174][175][176][177][178][179][180][excessive citations]

The cutters have intercepted smugglers carrying large shipments of drugs.[181] In February 2017 Joseph Napier intercepted a shipment of over four tons of cocaine, reported to be the largest drug-bust in the Atlantic Ocean since 1999.

Cutters are given tasks like looking for shipping containers full of toxic cargo that have fallen from container ships, as USCGC Margaret Norvell did in December 2015, when 25 containers fell from the barge Columbia Elizabeth.[182][183] Similarly, Charles Sexton helped search for the freighter El Faro when she was lost at sea during Hurricane Joaquin in October 2015.[184]

In 2018 and 2019 Oliver Berry and Joseph Gerczak made voyages beyond the design range, on missions from Hawaii to the Marshall Islands and American Samoa.[185][186] Both voyages took nine days.

In August 2022, one of the ships in the Sentinel class, Oliver Henry, was stuck in the Solomon Islands after the country's government failed to respond to a fuel request.[187]

In February 2024, Clarence Sutphin Jr. intercepted a shipment of weaponry on its way to the Houthi militia in the Red Sea.[188]

Namesakes

Summarize
Perspective

Charles "Skip" W. Bowen, who was then the Master Chief Petty Officer of the Coast Guard, is credited with leading the initiative of naming the vessels after enlisted rank individuals who served heroically in the Coast Guard or one of its precursor services.[189] Originally, the first vessel of the class was to be named USCGC Sentinel.[190]

In October 2010 the Coast Guard named the first fourteen individuals the vessels will be named after, and has provided biographies of them. [191][192][193] They are: Bernard C. Webber, Richard Etheridge, William Flores, Robert Yered, Margaret Norvell, Paul Clark, Charles David Jr, Charles Sexton, Kathleen Moore, Joseph Napier, William Trump, Isaac Mayo, Richard Dixon, Heriberto Hernandez. A second group of eleven names was announced on April 2, 2014.[194][failed verification]

In 2013 the name of Joseph Napier was reassigned to WPC-1115 when WPC-1110 was named after the recently deceased Commander Raymond Evans. The other ten new namesakes were: Winslow W. Griesser, Richard H. Patterson, Joseph Tezanos, Rollin A. Fritch, Lawrence O. Lawson, John F. McCormick, Bailey T. Barco, Benjamin B. Dailey, Donald R. Horsley, and Jacob L. A. Poroo. The 17th cutter (ex-USCGC Richard Patterson) was renamed as Donald Horsley after request of the Patterson Family, and the 24th cutter (ex-USCGC Donald Horsley) then was renamed as Oliver Berry.

In July 2014, Coast Guard Commandant Paul Zukunft announced that the Coast Guard would name an additional cutter after Senior Chief Petty Officer Terrell Horne, the first Coast Guard member to be murdered in the line of duty since 1927.[195][196][197]

In February 2015, the Coast Guard publicized ten more names tentatively assigned to cutters 26 through 35.[198] They were: Joseph Gerczak, Richard T. Snyder, Nathan Bruckenthal, Forrest O. Rednour, Robert G. Ward, Terrell Horne III, Benjamin A. Bottoms, Joseph O. Doyle, William C. Hart, and Oliver F. Berry.

In December 2017, the Coast Guard announced the names of the 35th through 54th cutters.[199] The twenty namesakes are: Angela McShan, Daniel Tarr, Edgar Culbertson, Harold Miller, Myrtle Hazard, Oliver Henry, Charles Moulthrope, Robert Goldman, Frederick Hatch, Glen Harris, Emlen Tunnell, John Scheuerman, Clarence Sutphin, Pablo Valent, Douglas Denman, William Chadwick, Warren Deyampert, Maurice Jester, John Patterson, and William Sparling. The 35th cutter (ex-USCGC Oliver Berry) is to be named as Angela McShan since the 24th cutter (ex-USCGC Donald Horsley) was renamed as Oliver Berry.

In October 2019, the Coast Guard named the namesakes of cutters 55 through 64. They are: Melvin Bell, David Duren, Florence Finch, John Witherspoon, Earl Cunningham, Frederick Mann, Olivia Hooker, Vincent Danz, Jeffrey Palazzo, and Marvin Perrett.[200]

Notes

  1. Originally was to be named Joseph Napier, but, in 2013, hull number WPC-1110 was reassigned to the name Raymond Evans to honor recently deceased Commander Raymond Evans. WPC-1115 became Joseph Napier.

References