Remove ads

The East Coast Railway (abbreviated ECoR) is one of the 19 railway zones of Indian Railways. It came into existence on 1 April 2003. The headquarters of the zone are at Bhubaneswar, Odisha.

Quick Facts Overview, Headquarters ...
East Coast Railway
15-East Coast Railway
Overview
HeadquartersBhubaneswar
LocaleOdisha
Chhattisgarh
Andhra Pradesh
Dates of operation1 April 2003; 21 years ago (2003-04-01)
PredecessorSouth Eastern Railway Zone
Technical
Track gauge5 ft 6 in (1,676 mm)
Electrification25 kV 50 Hz AC
Other
Websiteeastcoastrail.indianrailways.gov.in
Close

History

Consequent upon the parliament's approval, East Coast Railway was the first of the seven new zones to be inaugurated by the then Prime Minister of India H. D. Deve Gowda on 8 August 1996. The Officer-on-Special Duty took charge of the newly declared Zone on 16 September 1996. Initially, only one division namely Khurda Road was attached to this railway.

The zone became fully operational on 1 April 2003. The Waltair division was notified to be bifurcated from the East Coast Railway zone on 27 February 2019. The Odisha section of Waltair division will constitute the new Rayagada division, while the Andhra Pradesh section will be a part of the South Coast Railway zone upon operationalization.[1]

Remove ads

Divisions

The geographical jurisdiction of East Coast Railway zone extends over three states encompassing almost all of Odisha and Bastar, Mahasamund and Dantewada districts of Chhattisgarh and a minor part Palasa, Sompeta and seven other stations of Srikakulam district in Andhra Pradesh. The zonal headquarters is at Bhubaneswar in Odisha.

The zone has three divisions: Sambalpur, Khurda Road and Waltair.

The Rayagada railway division has been proposed to succeed a section of the existing Waltair division which will remain in the East Coast Railway zone upon bifurcation.[2]

Remove ads

Electrification

As of 31 December 2021, it is one of the three 100% electric railway zones in India.[3] The East Coast Railway line integrated with the commissioned Howrah-Chennai electrified trunk route on 29 November 2005. There was a missing link between Kharagpur and Visakhapatnam stations and all trains from Howrah towards Chennai side had to undergo a locomotive change from electric to diesel at Kharagpur and vice versa at Visakhapatnam in order to pass through Odisha. Even trains from New Delhi such as the Bhubaneswar Rajdhani had to undergo the change at Kharagpur. This frequent loco change on a trunk route became a time-consuming and inconvenient process. With electrification along the 765 km Kharagpur-Visakhapatnam stretch, trains got speeded up and the need for double headed diesels for high speed express trains was eliminated thus saving on diesel consumption and a cleaner travel. Additionally the line branching off Khurda road towards Puri was also electrified. Gradually the Cuttack-Angul line, Cuttack-Paradeep line and branch line from Jakhapura towards Barbil got electrified too.

Remove ads

Major railway stations

The major railway stations in the entire zone are Bhubaneswar, Cuttack, Chatrapur, Puri, Sambalpur, Khurda Road, Balugaon, Rayagada, Brahmapur, Angul, Dhenkanal, Bhadrak, Balangir, Bargarh, Jajpur Keonjhar Road, Titilagarh, Kesinga, Lanjigarh, Koraput, Mahasamund, Jagdalpur, Kendujhargarh, Palasa and Barbil.

Most of the major stations fall in the state of Odisha, Chhattisgarh.

Rail infrastructure

Routes

East Coast Railway zone has about 273 railway stations with a track length of 5214 km spread as follows:-

More information Division, Total kilometre ...
DivisionTotal kilometreElectrified kilometre
Track Route Track Route -
Total5,2142,6773,3711,543
Close

Railway lines

ECoR zone has below tracks. All are 5 ft 6 in (1,676 mm) broad gauge. The sections are:-

  1. Bhadrak-Bhubaneswar-Khurda Road- Double Electrified BG line [92 Railway stations]
  2. Talcher-Cuttack Double Electrified BG line [21 Railway stations]
  1. Titlagarh Junction-Mahasamund Single Electrified BG line [15 Railway stations] (Electric doubling of this line is currently underway)
  2. Cuttack-Paradip Double Electrified BG line [10 Railway stations]
  3. Khurda road-Puri Double Electrified BG line [11 Railway stations]
  4. Sambalpur Junction-Talcher Single Electrified BG line [16 Railway stations](Electric doubling of this line is currently underway)
  5. Titlagarh Junction-Sambalpur Junction Single Electrified BG line [16 Railway stations] (Electric doubling of this line is currently underway)
  6. Sambalpur Junction-Jharsuguda Junction Double Electrified BG line [10 Railway stations]
  7. Rayagada-Koraput Single Electric BG line [15 Railway stations]
  8. Naupada Junction-Gunupur Single Diesel BG line [14 Railway stations]
  9. Jakhapura Junction-Banspani Single Electrified BG line [17 Railway stations] (Electric doubling of this line is currently underway)
Remove ads

Loco sheds

See also

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.

Remove ads