2024–25 South Pacific cyclone season

Cyclone season in the South Pacific Ocean From Wikipedia, the free encyclopedia

2024–25 South Pacific cyclone season

The 2024–25 South Pacific cyclone season was one of the least active seasons on record within South Pacific Ocean to the east of 160°E, seeing four named storms forming, none of which intensified into severe tropical cyclones, the first such occurrence since the 2008–09 season. The season officially started on 1 November 2024, and will end on 30 April 2025; however a tropical cyclone could form at any time between 1 July 2024, and 30 June 2025, and would count towards the season total. During the season, tropical cyclones will be officially monitored by the Fiji Meteorological Service, Australian Bureau of Meteorology and New Zealand's MetService. The United States Armed Forces through the Joint Typhoon Warning Center (JTWC) will also monitor the basin and issue unofficial warnings for American interests. The FMS attaches a number and an F suffix to tropical disturbances that form in or move into the basin while the JTWC designates significant tropical cyclones with a number and a P suffix. The BoM, FMS and MetService all use the Australian Tropical Cyclone Intensity Scale and estimate windspeeds with a period of approximately ten minutes, while the JTWC estimates sustained winds over a 1-minute period, which are subsequently compared to the Saffir–Simpson hurricane wind scale (SSHWS).

Quick Facts Seasonal boundaries, First system formed ...
2024–25 South Pacific cyclone season
Thumb
Season summary map
Seasonal boundaries
First system formed28 December 2024
Last system dissipated16 April 2025
Strongest storm
NameRae
  Maximum winds110 km/h (70 mph)
(10-minute sustained)
  Lowest pressure975 hPa (mbar)
Seasonal statistics
Total disturbances11
Total depressions8
Tropical cyclones4
Severe tropical cyclones0 (record low, tied with 2008–09)
Total fatalities0 (6)
Total damageUnknown
Related articles
South Pacific tropical cyclone seasons
2022–23, 2023–24, 2024–25, 2025–26, 2026–27
Close

Seasonal forecasts

Summarize
Perspective
More information Source/Record, Region ...
Source/Record Region Tropical
Cyclone
Severe
Tropical
Cyclones
Ref
Records
Average (1969–70 – 2023–24):160°E – 120°W73[1]
Record high:160°E – 120°W1997–98: 161982–83: 9[2]
Record low:160°E – 120°W1990–91:  22008–09:  0[2]
Predictions
NIWA October135°E – 120°W9–144–8[3]
FMS Whole160°E – 120°W5–61–2[1]
FMS Western160°E – 180°2–51–2[1]
FMS Eastern180°   – 120°W1–20–1[1]
Close

Ahead of the season officially starting on 1 November, the Fiji Meteorological Service (FMS) and New Zealand's National Institute of Water and Atmospheric Research (NIWA), both issued a tropical cyclone outlook that discussed the upcoming season.[1][3] These outlooks took into account a variety of factors such as a developing weak to moderate La Niña event and what had happened in previous seasons such as 1983–84, 1995–96, 2000–01, 2005–06, 2008–09, 2016–17 and 2017–18.[1][3] The Southwest Pacific tropical cyclone outlook issued by New Zealand's National Institute of Water and Atmospheric Research (NIWA) in conjunction with MetService and various other Pacific meteorological services, predicted that six to ten tropical cyclones would occur over the South Pacific Ocean between 135°E and 120°W.[3] The outlook also predicted that three to four of these tropical cyclones would intensify further and become either a Category three, four or five severe tropical cyclone on the Australian tropical cyclone intensity scale.[3] In addition to contributing towards the Southwest Pacific tropical cyclone outlook, the FMS predicted that between five and six tropical cyclones would occur within the basin, while one or two of these tropical cyclones were expected to intensify further and become either a category three, four or five severe tropical cyclone on the Australian scale.[1] Both outlooks also predicted that the majority of systems would occur to the west of the International Dateline, which as a result meant that the Solomon Islands had a normal to elevated risk of being impacted by a tropical cyclone.[1][3] It was also predicted that Vanuatu and New Caledonia had a normal chance of being impacted by a tropical cyclone while Fiji, Niue, Samoa, American Samoa, Tokelau, Tonga, Tuvalu, Wallis and Futuna had a normal to reduced chance of being impacted by a tropical cyclone.[3]

Seasonal summary

Summarize
Perspective
Cyclone Rae (2025)Tropical cyclone scales#Australia and Fiji

Early season activity

The season began abnormally late, the first system of the season, Tropical Depression 01F formed in late December. The storm eventually made landfall in Fiji and dissipated during the last few days of the year. Tropical Disturbances 02F and 03F were designated on 31 December and 5 January respectively, both stayed out to sea moving southeastwards before both dissipating 3 days later.

Thumb
Three systems active on 25 February: Cyclone Alfred (left), Cyclone Seru (centre), and Cyclone Rae (right).

The first named storm of the season, Tropical Cyclone Pita formed on 9 January. The storm dropped heavy rains that resulted in flooding across Samoa and Fiji, isolated flooding occurred in the latter nation including the collapse of a bridge.

Peak season activity

After a long pause in activity, two Tropical Depressions (05F and 07F) were monitored in early and mid-February. 06F however failed to reach Tropical Depression status. Tropical Depression 08F were monitored later that month. On 22 February Tropical Cyclone Rae developed passing just east of Fiji. On 23 February, the Fiji Meteorological Service named Tropical Cyclone Rae. Rae peaked on 25 February with winds of 110km/h and 975 hpa. A few days later on 24 February, Tropical Cyclone Seru formed. Seru peaked with 110km/h and 980 hpa on 25 February. Rae and Seru turned extratropical on 26 February and 1 March, respectively.

Late season activity

After a second, even more significant lull in activity, Tropical Cyclone Tam was named on 14 April by the Fiji Meteorological Service. It intensified into a deep subtropical cyclone by 16 April, bringing severe weather to northern New Zealand and causing 5 deaths in New South Wales in Australia.

Systems

Summarize
Perspective

Tropical Depression 01F

Quick Facts Duration, Peak intensity ...
Tropical depression (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration28 December – 30 December
Peak intensity95 km/h (60 mph) (1-min);
1004 hPa (mbar)
Close

Tropical Disturbance 02F

Quick Facts Duration, Peak intensity ...
Tropical disturbance (Australian scale)
Thumb Thumb
Duration31 December – 2 January
Peak intensityWinds not specified;
1006 hPa (mbar)
Close

On 31 December, a low-pressure area formed on the sea northeastern of Australia. It became a tropical disturbance on the same day.

Tropical Disturbance 03F

Quick Facts Duration, Peak intensity ...
Tropical disturbance (Australian scale)
Thumb Thumb
Duration5 January – 8 January
Peak intensityWinds not specified;
997 hPa (mbar)
Close

On 5 January, a low-pressure area formed near Samoa. The Fiji Meteorological Service (FMS) noticed it and designated it as a tropical disturbance on the same day, stating it lay within a low sheared environment with good upper divergence, and over sea surface temperature at 30°C. FMS analysed the potential for tropical cyclone development to be low to moderate.[4] Later that day, the FMS downgraded it to a very low chance. After heading southeastward, it became extratropical on 8 January, causing the FMS to cease advisories.

Tropical Cyclone Pita

Quick Facts Duration, Peak intensity ...
Category 1 tropical cyclone (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration9 January – 12 January
Peak intensity65 km/h (40 mph) (10-min);
995 hPa (mbar)
Close

The Fiji Meteorological Service named Cyclone Pita as the first tropical cyclone of the season. The storm passed over Niue and Cook Islands before being downgraded to a depression.

Heavy rains associated with the tropical cyclone caused flooding in Fiji and Samoa. In Fiji, this flooding resulted in isolated damages, including the collapse of a bridge, although no fatalities were reported.[5]

Tropical Depression 05F

Quick Facts Duration, Peak intensity ...
Tropical depression (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration31 January – 5 February
Peak intensity85 km/h (50 mph) (1-min);
997 hPa (mbar)
Close

Tropical Depression 05F was a tropical storm that formed on 31 February. This tropical storm was close to the Loyalty Islands, causing damages and no electricity, until it dissipated on 5 February. [citation needed]

Tropical Disturbance 06F

Quick Facts Duration, Peak intensity ...
Tropical disturbance (Australian scale)
Subtropical storm (SSHWS)
Thumb Thumb
Duration4 February (Entered basin) – 8 February
Peak intensity75 km/h (45 mph) (1-min);
996 hPa (mbar)
Close

Tropical Depression 07F

Quick Facts Duration, Peak intensity ...
Tropical depression (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration11 February (Entered basin) – 13 February
Peak intensity75 km/h (45 mph) (1-min);
998 hPa (mbar)
Close

Tropical Depression 08F

Quick Facts Duration, Peak intensity ...
Tropical depression (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration19 February – 22 February
Peak intensity95 km/h (60 mph) (1-min);
998 hPa (mbar)
Close

Tropical Cyclone Rae

Quick Facts Duration, Peak intensity ...
Category 2 tropical cyclone (Australian scale)
Category 2 tropical cyclone (SSHWS)
Thumb Thumb
Duration22 February – 26 February
Peak intensity110 km/h (70 mph) (10-min);
975 hPa (mbar)
Close

On 22 February, the FMS designated Tropical Depression 09F and later had a moderate to high chance to become a tropical cyclone. On 23 February at 06:00 UTC, the FMS named Tropical Cyclone Rae.[6] Rae brought heavy rainfall and triggered flooding to parts of Fiji. In Sawana, a lot of trees were uprooted by strong winds and blocked roads on Vanua Balavu. Farms were destroyed and the village suffered from food and water shortage.

Tropical Cyclone Seru

Quick Facts Duration, Peak intensity ...
Category 2 tropical cyclone (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration24 February – 27 February
Peak intensity110 km/h (70 mph) (10-min);
980 hPa (mbar)
Close

On the 24th of February, Tropical Cyclone Seru formed northeast of Vanuatu. It slowly intensified while tracking south over the next few days, becoming a Category 2 tropical cyclone on the Australian scale.[7] Seru caused minimal damage in southern Vanuatu, and dissipated into a remnant low on the 1st of March.

Tropical Cyclone Tam

Quick Facts Duration, Peak intensity ...
Category 1 tropical cyclone (Australian scale)
Tropical storm (SSHWS)
Thumb Thumb
Duration14 April – 16 April
Peak intensity85 km/h (50 mph) (10-min);
986 hPa (mbar)
Close

Tropical Cyclone Tam was named on 14th April by the Fiji Meteorological Service. It transitioned into a deep subtropical cyclone on the 16th April and caused severe weather conditions in northern New Zealand, leading to power outages and travel disruptions in the Northland Region and Auckland.[8] Strong waves cased by Tam resulted in 5 drownings in New South Wales.[9] By 17 April, Cyclone Tam had caused power outages at 6,000 properties in Northland, the Coromandel Peninsula, Bay of Plenty and Gisborne.[10][11]

By 18 April, Cyclone Tam had caused flooding in the Coromandel Peninsula, disrupting roads and highways.[11] In addition, flooding and strong winds were also reported in the Far North District, causing road closures and flight disruptions.[12] By 19 April, Auckland authorities had issued an emergency alert in response to flooding, thunderstorms and travel disruptions.[13] On 20 April, Auckland authorities issued a second emergency alert in response to flooding caused by Cyclone Tam.[14]

By 21 April, ex-tropical Cyclone Tam had begun to ease despite heavy rain and thunderstorms in parts of the North and South Island. At its peak, 24,000 homes in Northland had experienced power outages. By 21 April, fewer than 100 houses in Northland remained without power. The Auckland Council inspected 16 properties that had experienced flooding.[15] By 22 April, line companies had restored power to most houses in Northland, with about 25 Far North homes still remaining disconnected.[16]

Other systems

On 13 December, a subtropical cyclone formed near the Cook Islands and was designated 95P by the Joint Typhoon Warning Center. It transitioned into an extratropical cyclone on 17 December.[17]

Storm names

Within the Southern Pacific, a tropical depression is judged to have reached tropical cyclone intensity should it reach winds of 65 km/h (40 mph) and it is evident that gales are occurring at least halfway around the center. Tropical depressions intensifying into a tropical cyclone between the Equator and 26°S and between 160°E - 120°W are named by the FMS; should a tropical depression intensify to the south of 26°S between 160°E and 120°W it will be named in conjunction with the FMS by MetService. Should a tropical cyclone move out of the basin and into the Australian region it will retain its original name. The next 12 names are listed below: [18]

  • Pita
  • Rae
  • Seru
  • Tam
  • Urmil (unused)
  • Vaianu (unused)
  • Wati (unused)
  • Xavier (unused)
  • Yani (unused)
  • Zita (unused)
  • Arthur (unused)
  • Becky (unused)

Season effects

Summarize
Perspective

This table lists all the storms that developed in the South Pacific to the east of longitude 160°E during the 2024–25 season. It includes their intensity on the Australian tropical cyclone intensity scale, duration, name, landfalls, deaths, and damages. All data is taken from RSMC Nadi and/or TCWC Wellington, and all of the damage figures are in 2024 or 2025 USD.

More information Name, Dates ...
Name Dates Peak intensity Areas affected Damage
(USD)
Deaths Refs
Category Wind speed Pressure
01F December 28 – 30 Tropical depression Not specified 1004 hPa (29.65 inHg) Fiji None None
02F December 31, 2024 – January 2, 2025 Tropical disturbance Not specified 1006 hPa (29.71 inHg) None None None
03F January 5 – 8 Tropical disturbance Not specified 997 hPa (29.44 inHg) Samoa, Niue None None
Pita January 9 – 12 Category 1 tropical cyclone 65 km/h (40 mph) 995 hPa (29.38 inHg) Tonga, Niue, Cook Islands None None
05F January 31 – February 5 Tropical depression Not specified 997 hPa (29.44 inHg) Loyalty Islands, Vanuatu None None
06F February 4 – 8 Tropical disturbance Not specified 996 hPa (29.41 inHg) New Caledonia None None
07F February 11 – 13 Tropical depression Not specified 998 hPa (29.47 inHg) New Caledonia None None
08F February 19 – 22 Tropical depression Not specified 998 hPa (29.47 inHg) Niue None None
Rae February 22 – 26 Category 2 tropical cyclone 110 km/h (70 mph) 975 hPa (28.79 inHg) Fiji, Wallis and Futuna, Tonga Unknown None
Seru February 24 – 27 Category 2 tropical cyclone 110 km/h (70 mph) 980 hPa (28.94 inHg) Fiji, Vanuatu None None
Tam April 14 – 16 Category 1 tropical cyclone 85 km/h (50 mph) 988 hPa (29.18 inHg) Vanuatu, Norfolk Island, New Zealand, Australia (New South Wales) Unknown 0 (6)
Season aggregates
11 systems28 December 2024 – 16 April 2025110 km/h (70 mph)975 hPa (28.79 inHg)Unknown0 (6)
Close

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.