Beijing–Tangshan intercity railway

Railway line in China From Wikipedia, the free encyclopedia

Beijing–Tangshan intercity railway is a high-speed railway connecting Beijing and Tangshan in eastern Hebei. The railway opened on 30 December 2022.[2]

Quick Facts Beijing–Tangshan intercity railway 京唐城际铁路, Overview ...
Beijing–Tangshan intercity railway
京唐城际铁路
Overview
StatusOperational
LocaleBeijing
Hebei
Tianjin
Termini
Stations9
Service
TypeHigh-speed rail
Operator(s)China Railway Beijing Group
History
Opened30 December 2022 (2022-12-30)[2]
Technical
Line length163 km (101 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Route map

 Beijing underground cross-city railway to Beijing West
 Beijing–Shanghai Railway
 Beijing–Shenyang HSR to Shenyang North
Beijing
 Beijing–Harbin Railway to Harbin
 Beijing–Baotou Railway
Beijing Sub-Center (Opening in 2024)
Yanjiao
Dachang
Xianghe
Baodi
 Beijing–Binhai ICR to Binhai West
Yutian South
Tangshan West
 Tianjin–Qinhuangdao HSR to Tianjin  
Tangshan
 Tianjin–Qinhuangdao HSR to Qinhuangdao  
Close
Quick Facts Simplified Chinese, Traditional Chinese ...
Beijing–Tangshan intercity railway
Simplified Chinese京唐城际铁路
Traditional Chinese京唐城際鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinJīng-Táng Chéngjì Tiělù
Close

From Beijing railway station[1] to Baodi railway station, the Beijing–Binhai intercity railway will share its northern segment with the BeijingTangshan intercity railway before continuing southeast-ward to Binhai West railway station.[3]

Overview

The railway will begin at Beijing railway station, which is located in Dongcheng District of Beijing.[1] The Beijing Sub-Center railway station is under construction and will be finished in 2025. And then it crossing into Hebei's Xianghe County. Next it crosses Tianjin's Baodi District to re-enter Hebei at Tangshan City's Yutian County and Fengrun District. Finally, it will terminate at Tangshan railway station. Total line length of will be approximately 163 km (101 mi), with a total of 8 stations and a design speed of 350 km/h (220 mph).[4]

History

Construction on the railway was originally scheduled to start in 2009[5] but the completion has been delayed after a nationwide rail review following the 2011 Wenzhou Rail Incident. Construction was eventually started on 29 December 2015.[6] The railway opened on 30 December 2022.[2][7]

Stations

More information Station Name, Chinese ...
Station
Name
Chinese Total distance (km) Travel Time High-speed rail
& local rail transfers
Metro
transfers
Platforms Tracks served
by platform
Location
Beijing[1] 北京 0 0 Beijing Subway  2  Beijing Dongcheng
Beijing Sub-Center (Opening in 2024) 北京城市副中心 (Beijing Subway  6  via Beiyunhedong) Tongzhou
Yanjiao 燕郊
Dachang 大厂
Xianghe 香河
Baodi 宝坻 Beijing–Binhai intercity railway
Tianjin–Chengde intercity railway (planned)
Yutian South[8] 玉田南
Tangshan West[8] 唐山西
Tangshan 唐山
Close

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.