Antares (/ænˈtɑːrz/), known during early development as Taurus II, is an expendable launch system developed by Orbital Sciences Corporation (later part of Northrop Grumman) and the Pivdenne Design Bureau to launch the Cygnus spacecraft to the International Space Station as part of NASA's COTS and CRS programs. Able to launch payloads heavier than 8,000 kg (18,000 lb) into low Earth orbit, Antares is the largest rocket operated by Northrop Grumman. Antares launches from the Mid-Atlantic Regional Spaceport and made its inaugural flight on April 21, 2013.[12] Antares 100 was retired in 2014 and series 200 was retired in 2023 due to component unavailability. As of January 2024 Antares 300 is under development.

Quick Facts Function, Manufacturer ...
Antares
Launch of an Antares 230
FunctionMedium-lift launch vehicle
Manufacturer
Country of originUnited States
Project costUS$472 million until 2012[1]
Cost per launchUS$80−85 million[2]
Size
Height
  • 110/120: 40.5 m (133 ft)[3][4]
  • 130: 41.9 m (137 ft)
  • 230/230+: 42.5 m (139 ft)[5]
Diameter3.9 m (13 ft)[6][5]
Mass
  • 110/120/130: 282,000–296,000 kg (622,000–653,000 lb)[4]
  • 230/230+: 298,000 kg (657,000 lb)[5]
Stages2 to 3[6]
Capacity
Payload to LEO
Mass8,000 kg (18,000 lb)[7]
Associated rockets
ComparableDelta II, Atlas III
Launch history
Status
  • 110: retired
  • 120: retired
  • 130: retired
  • 230: retired
  • 230+: retired
  • 300: planned
Launch sitesMARS, LP-0A
Total launches18 (110: 2, 120: 2, 130: 1, 230: 5, 230+: 8)
Success(es)17 (110: 2, 120: 2, 130: 0, 230: 5, 230+: 8)
Failure(s)1 (130: 1)
First flight
  • 110: April 21, 2013
  • 120: January 9, 2014
  • 130: October 28, 2014
  • 230: October 17, 2016
  • 230+: November 2, 2019
  • 300: June 2025 (planned)
Last flight
  • 110: September 18, 2013
  • 120: July 13, 2014
  • 130: October 28, 2014
  • 230: April 17, 2019
  • 230+: August 2, 2023
Type of passengers/cargoCygnus
First stage (Antares 100)
Empty mass18,700 kg (41,200 lb)[4]
Gross mass260,700 kg (574,700 lb)[4]
Powered by2 × NK-33 (AJ26-62)[8]
Maximum thrust3,265 kN (734,000 lbf)[8]
Specific impulseSea level: 297 s (2.91 km/s)
Vacuum: 331 s (3.25 km/s)[4]
Burn time235 seconds[4]
PropellantRP-1 / LOX[8]
First stage (Antares 200)
Empty mass20,600 kg (45,400 lb)[5]
Gross mass262,600 kg (578,900 lb)[5]
Powered by2 × RD-181[5]
Maximum thrust3,844 kN (864,000 lbf)[5]
Specific impulseSea level: 311.9 s (3.059 km/s)
Vacuum: 339.2 s (3.326 km/s)[5]
Burn time215 seconds[5]
PropellantRP-1 / LOX
First stage (Antares 300)
Powered by7 × Miranda[9]
PropellantRP-1 / LOX
Second stage – Castor 30A/B/XL
Gross mass
  • 30A: 14,035 kg (30,942 lb)
  • 30B: 13,970 kg (30,800 lb)
  • 30XL: 26,300 kg (58,000 lb)[4]
Propellant mass
  • 30A: 12,815 kg (28,252 lb)
  • 30B: 12,887 kg (28,411 lb)[4]
  • 30XL: 24,200 kg (53,400 lb)[5]
Maximum thrust
  • 30A: 259 kN (58,200 lbf)
  • 30B: 293.4 kN (65,960 lbf)[8][4]
  • 30XL: 474 kN (107,000 lbf)[10]
Burn time
  • 30A: 136 seconds
  • 30B: 127 seconds
  • 30XL: 156 seconds[4][5]
PropellantTP-H8299 / Al / AP[11]
Close

NASA awarded Orbital a Commercial Orbital Transportation Services (COTS) Space Act Agreement (SAA) in 2008 to demonstrate delivery of cargo to the International Space Station. Orbital (and later Northrop Grumman) used Antares to launch its Cygnus spacecraft for these missions. As of August 2023 it has only been used for Cygnus launches to the ISS, despite it being intended for commercial launches. Originally designated the Taurus II, Orbital Sciences renamed the vehicle Antares, after the star of the same name,[13] on December 12, 2011.

Out of 18 total launches, Antares has suffered one failure. During the fifth launch on October 28, 2014, the rocket failed catastrophically, and the vehicle and payload were destroyed.[14] The rocket's first-stage engines were identified as the cause for the failure. A different engine was chosen for subsequent launches, and the rocket had a successful return to flight on October 17, 2016.

The Antares has flown two major design iterations, the 100 series and 200 series. Both series have used a Castor 30XL as an upper stage but have differed on the first stage.[15] The 100 series used two Kerolox powered AJ26 engines in the first stage and launched successfully four times. The 100 series was retired following a launch failure in 2014.[16] The 200 series which first flew in 2016 also featured a Kerolox first stage but instead used two RD-181 engines along with other minor upgrades. The 200 series future became uncertain following the Russian invasion of Ukraine. Due to the first stage being produced in Ukraine and the engines in Russia, future production of the rocket was unable to be continued.[15] As a result Northrop Grumman entered into an agreement with Firefly Aerospace to build the first stage of the Antares 300 series. Northrop also contracted with SpaceX for 3 Falcon 9 launches.[17]

Development

The NASA COTS award was for US$171 million and Orbital Sciences expected to invest an additional $150 million, split between $130 million for the booster and $20 million for the spacecraft.[18] A Commercial Resupply Service contract of $1.9 billion for eight flights was awarded in 2008.[19] As of April 2012, development costs were estimated at $472 million.[1]

In June 2008, it was announced that the Mid-Atlantic Regional Spaceport, formerly part of the Wallops Flight Facility, in Virginia, would be the primary launch site for the rocket.[20] Launch pad 0A (LP-0A), previously used for the failed Conestoga rocket, would be modified to handle Antares.[21] Wallops allows launches which reach the International Space Station's orbit as effectively as those from Cape Canaveral, Florida, while being less crowded.[18][22] The first Antares flight launched a Cygnus mass simulator.[23]

On December 10, 2009, Alliant Techsystems Inc. (ATK) test-fired their Castor 30 motor for use on the second stage of the Antares rocket.[24] In March 2010, Orbital Sciences and Aerojet completed test firings of the AJ-26 engines. [25] On February 22, 2013, a hot fire test was successfully performed, the entire first stage being erected on the pad and held down while the engines fired for 29 seconds.[23]

Design

Thumb
An assembled Antares rocket in the Horizontal Integration Facility.

First stage

The first stage of Antares burns RP-1 (kerosene) and liquid oxygen (LOX). As Orbital had little experience with large liquid stages and LOX propellant, the first stage core was designed and is manufactured in Ukraine by Pivdenne Design Office and Pivdenmash[18] and includes propellant tanks, pressurization tanks, valves, sensors, feed lines, tubing, wiring and other associated hardware.[26] Like the Zenit—also manufactured by Pivdenmash—the Antares vehicle has a diameter of 3.9 m (150 in) with a matching 3.9 m payload fairing.[6]

Antares 100 series

The Antares 100-series first stage was powered by two Aerojet AJ26 engines. These began as Kuznetsov NK-33 engines built in the Soviet Union in the late 1960s and early 1970s, 43 of which were purchased by Aerojet in the 1990s. Twenty of these were refurbished into AJ26 engines for Antares.[27] Modifications included equipping the engines for gimballing, adding US electronics, and qualifying the engines to fire for twice as long as designed and to operate at 108% of their original thrust.[3][25] Together they produced 3,265 kilonewtons (734,000 lbf) of thrust at sea level and 3,630 kN (816,100 lbf) in vacuum.[8]

Following the catastrophic failure of an AJ26 during testing at Stennis Space Center in May 2014 and the Orb-3 launch failure in October 2014, likely caused by an engine turbopump,[28] the Antares 100-series was retired.

Antares 200 series

Because of concerns over corrosion, aging, and the limited supply of AJ26 engines, Orbital had selected new first stage engines[25][29] to bid on a second major long-term contract for cargo resupply of the ISS. After the loss of the Antares rocket in October 2014, Orbital Sciences announced that the Russian RD-181—a modified version of the RD-191—would replace the AJ-26 on the Antares 200-series.[30][31] The first flight of the Antares 230 configuration using the RD-181 launched on October 17, 2016, carrying the Cygnus OA-5 cargo to the ISS.

The Antares 200 and 200+ first stages are powered by two RD-181 engines, which provide 440 kilonewtons (100,000 lbf) more thrust than the dual AJ26 engines used on the Antares 100. Orbital adapted the existing core stage to accommodate the increased performance in the 200 Series, allowing Antares to deliver up to 6,500 kg (14,300 lb) to low Earth orbit.[7] The surplus performance of the Antares 200-series will allow Orbital to fulfill its ISS resupply contract in only four additional flights, rather than the five that would have been required with the Antares 100-series.[32][33][34]

While the 200 series adapted the originally ordered 100 Series stages (KB Pivdenne/Pivdenmash, Zenit derived),[35] it requires under-throttling the RD-181 engines, which reduces performance.[33]

The Antares was upgraded to the Antares 230+ for the NASA Commercial Resupply Services 2 contract. NG-12, launched November 2, 2019, was the first NASA CRS-2 mission to ISS using the 230+ upgrades. The most significant upgrades were structural changes to the intertank bay (between the LOX and RP-1 tanks) and the forward bay (forward of the LOX). Additionally, the company is working on trajectory improvements via a "load-release autopilot" that will provide greater mass to orbit capability.[36]

Antares 300 series

In August 2022, Northrop Grumman announced that it had contracted Firefly Aerospace to build the 300-series first stage, which is similar to Firefly's in-development MLV launch vehicle, and features the same composite structures as well as seven Miranda engines producing 7,200 kN (1,600,000 lbf) of thrust — substantially greater than the previous 200-series first stage. Northrop Grumman states that the new first stage substantially increases the mass capability of Antares.[37][9]

The announcement occurred as a result of the 2022 Russian invasion of Ukraine, which has jeopardized supply chains for the previous first stages, which are manufactured in Ukraine and use RD-181 engines from Russia.[38]

Second stage

The second stage is an Orbital ATK Castor 30-series solid-fuel rocket, developed as a derivative of the Castor 120 solid motor used as Minotaur-C's first stage, itself based on a LGM-118 Peacekeeper ICBM first stage.[39] The first two flights of Antares used a Castor 30A, which was replaced by the enhanced Castor 30B for subsequent flights. The Castor 30B produces 293.4 kN (65,960 lbf) average and 395.7 kN (88,960 lbf) maximum thrust, and uses electromechanical thrust vector control.[8] For increased performance, the larger Castor 30XL is available[35] and will be used on ISS resupply flights to allow Antares to carry the Enhanced Cygnus.[8][40][41]

The Castor 30XL upper stage for Antares 230+ is being optimized for the CRS-2 contract. The initial design of the Castor 30XL was conservatively built, and after gaining flight experience it was determined that the structural component of the motor case could be lightened.[36]

Third stage

Antares offers three optional third stages: the Bi-Propellant Third Stage (BTS), a Star 48-based third stage and an Orion 38 motor. BTS is derived from Orbital Sciences' GEOStar spacecraft bus and uses nitrogen tetroxide and hydrazine for propellant; it is intended to precisely place payloads into their final orbits.[6] The Star 48-based stage uses a Star 48BV solid rocket motor and would be used for higher energy orbits.[6] The Orion 38 is used on the Minotaur and Pegasus rockets as an upper stage.[42]

Fairing

The 3.9-meter (13 ft) diameter, 9.9-meter (32 ft) high fairing is manufactured by Northrop Grumman of Iuka, Mississippi, which also builds other composite structures for the vehicle, including the combined fairing adapter, dodecagon, motor cone, and interstage.[43]

Thumb
Rear exhaust section of the rocket

NASA Commercial Resupply Services-2 : Enhancements

On January 14, 2016, NASA awarded three cargo contracts via CRS-2. Orbital ATK's Cygnus was one of these contracts.[44]

According to Mark Pieczynski, Orbital ATK Vice President, Flight Systems Group, "A further improved version [of Antares for CRS-2 contract] is in development which will include: Stage 1 core updates including structural reinforcements and optimization to accommodate increased loads. (Also) certain refinements to the RD-181 engines and CASTOR 30XL motor; and Payload accommodations improvements including a 'pop-top' feature incorporated in the fairing to allow late Cygnus cargo load and optimized fairing adapter structure".

Previously, it was understood that these planned upgrades from the Antares 230 series would create a vehicle known as the Antares 300 series. However, when asked specifically about Antares 300 series development, Mr. Pieczynski stated that Orbital ATK has "not determined to call the upgrades, we are working on, a 300 series. This is still TBD".[45]

In May 2018, the Antares program manager Kurt Eberly indicated that the upgrades will be referred to as Antares 230+.[36]

Configurations and numbering

Thumb
A test firing of the Castor 30 second stage

The first two test flights used a Castor 30A second stage. All subsequent flights will use either a Castor 30B or Castor 30XL. The rocket's configuration is indicated by a three-digit number, the first number representing the first stage, the second the type of second stage, and the third the type of third stage.[40] A + sign added as suffix (fourth position) signifies performance upgrades to the Antares 230 variant.

More information Number, First digit ...
Number First digit Second digit Third digit
(First stage) (Second stage) (Third stage)
0 No third stage
1 2 × AJ26-62 Castor 30A BTS (3 × BT-4)
2 2 × RD-181 Castor 30B Star 48BV
3 7 × Miranda Castor 30XL Orion 38
Close

Notable missions and anomalies

Antares A-ONE

Originally scheduled for 2012, the first Antares launch, designated A-ONE[46] was conducted on April 21, 2013,[47] carrying the Cygnus Mass Simulator (a boilerplate Cygnus spacecraft) and four CubeSats contracted by Spaceflight Incorporated: Dove 1 for Cosmogia Incorporated (now Planet Labs) and three PhoneSat satellites – Alexander,[48] Graham and Bell for NASA.[49]

Prior to the launch, a 27-second test firing of the rocket's AJ26 engines was conducted successfully on February 22, 2013, following an attempt on February 13 which was abandoned before ignition.[23]

A-ONE used the Antares 110 configuration, with a Castor 30A second stage and no third stage. The launch took place from Pad 0A of the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia. LP-0A was a former Conestoga launch complex which had only been used once before, in 1995, for the Conestoga's only orbital launch attempt.[11] Antares became the largest — and first — liquid-fuelled rocket to fly from Wallops Island, as well as the largest rocket launched by Orbital Sciences.[46]

The first attempt to launch the rocket, on April 17, 2013, was scrubbed after an umbilical detached from the rocket's second stage, and a second attempt on April 20 was scrubbed due to high altitude winds.[50] At the third attempt on April 21, the rocket lifted off at the beginning of its launch window. The launch window for all three attempts was three hours beginning at 21:00 UTC (17:00 EDT), shortening to two hours at the start of the terminal count, and ten minutes later[clarification needed] in the count.[11][51]

Cygnus CRS Orb-3

Video of Cygnus CRS Orb-3 failed launch
Thumb
Pad 0A after the incident

On October 28, 2014, the attempted launch of an Antares carrying a Cygnus cargo spacecraft on the Orb-3 resupply mission failed catastrophically six seconds after liftoff from Mid-Atlantic Regional Spaceport at Wallops Flight Facility, Virginia.[52] An explosion occurred in the thrust section just as the vehicle cleared the tower, and it fell back down onto the launch pad. The range safety officer sent the destruct command just before impact.[14][53] There were no injuries.[54] Orbital Sciences reported that Launch Pad 0A "escaped significant damage",[53] though initial estimates for repairs were in the $20 million range.[55] Orbital Sciences formed an anomaly investigation board to investigate the cause of the incident. They traced it to a failure of the first stage LOX turbopump, but could not find a specific cause. However, the refurbished NK-33 engines, originally manufactured over 40 years earlier and stored for decades, were suspected as having leaks, corrosion, or manufacturing defects that had not been detected.[56] The NASA Accident Investigation Report was more direct in its failure assessment.[57] On October 6, 2015, almost one year after the accident, Pad 0A was restored to use. Total repair costs were about $15 million.[58]

Following the failure, Orbital sought to purchase launch services for its Cygnus spacecraft in order to satisfy its cargo contract with NASA,[29] and on December 9, 2014, Orbital announced that at least one, and possibly two, Cygnus flights would be launched on Atlas V rockets from Cape Canaveral Air Force Station.[59] As it happened, Cygnus OA-4 and Cygnus OA-6 were launched with an Atlas V and the Antares 230 performed its maiden flight with Cygnus OA-5 in October 2016. One further mission was launched aboard an Atlas in April 2017 (Cygnus OA-7), fulfilling Orbital's contractual obligations towards NASA. It was followed by the Antares 230 in regular service with Cygnus OA-8E in November 2017, with three further missions scheduled on their extended contract.

Launch statistics

Rocket configurations

  •   Antares 110
  •   Antares 120
  •   Antares 130
  •   Antares 230
  •   Antares 230+

Launch outcomes

1
2
3
2013
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23
  •   Failure
  •   Partial failure
  •   Success
  •   Scheduled

Operator

1
2
3
2013
'14
'15
'16
'17
'18
'19
'20
'21
'22
'23

Launch history

More information Flight No., Date / time (UTC) ...
Flight No. Date / time (UTC) Rocket variant Launch site Payload,
Spacecraft name
Payload mass Orbit Launch contractor User Launch
outcome
1 April 21, 2013
21:00
Antares 110 MARS Pad 0A Low Earth Orbital Sciences Corporation NASA Success
Antares A-ONE, Antares test flight, using a Castor 30A second stage and no third stage.[12][60]
2 September 18, 2013
14:58
Antares 110 MARS Pad 0A Cygnus (standard) Orb-D1
G. David Low[61]
700 kg
(1,543 lb)[62]
Low Earth (ISS) Orbital Sciences Corporation NASA Success
Orbital Sciences COTS demonstration flight. First Antares mission with a real Cygnus capsule, first mission to rendezvous and berth with the International Space Station, second launch of Antares. The rendezvous maneuver was delayed due to a computer data link problem,[63] but the issue was resolved and berthing followed shortly thereafter.[64][65]
3 January 9, 2014
18:07
Antares 120 MARS Pad 0A Cygnus (standard) CRS Orb-1
C. Gordon Fullerton[61]
1,260 kg
(2,780 lb)[66]
Low Earth (ISS) Orbital Sciences Corporation NASA Success
First Commercial Resupply Service (CRS) mission for Cygnus, and first Antares launch using the Castor 30B upper stage.[40][67]
4 July 13, 2014
16:52
Antares 120 MARS Pad 0A Cygnus (standard) CRS Orb-2
Janice Voss[68]
1,494 kg
(3,293 lb)[69]
Low Earth (ISS) Orbital Sciences Corporation NASA Success
Spacecraft carried supplies for the ISS, including research equipment, crew provisions, hardware, and science experiments.[70]
5 October 28, 2014
22:22
Antares 130 MARS Pad 0A Cygnus (standard) CRS Orb-3
Deke Slayton[71]
2,215 kg
(4,883 lb)[72]
Low Earth (ISS) Orbital Sciences Corporation NASA Failure
LOX turbopump failure T+6 seconds. Rocket fell back onto the pad and exploded.[57][52][54] First Antares launch to use Castor 30XL upper stage. In addition to ISS supplies, payload included a Planetary Resources Arkyd-3 satellite[73] and a NASA JPL/UT Austin CubeSat mission named RACE.[74]
6 October 17, 2016
23:45
Antares 230 MARS Pad 0A Cygnus (enhanced) CRS OA-5
Alan G. Poindexter[75]
2,425 kg
(5,346 lb)[76]
Low Earth (ISS) Orbital ATK NASA Success
First launch of Enhanced Cygnus on Orbital's new Antares 230.[34][77][78][79]
7 November 12, 2017
12:19
Antares 230 MARS Pad 0A Cygnus (enhanced) CRS OA-8E
Gene Cernan[80]
3,338 kg
(7,359 lb)[81]
Low Earth (ISS) Orbital ATK NASA Success
8 May 21, 2018
08:44
Antares 230 MARS Pad 0A Cygnus (enhanced) CRS OA-9E
J.R. Thompson[82]
3,350 kg
(7,386 lb)[83]
Low Earth (ISS) Orbital ATK NASA Success
Spacecraft carried ISS hardware, crew supplies, and scientific payloads, including the Cold Atom Lab and the Biomolecule Extraction and Sequencing Technology experiment.[83] The Cygnus also demonstrated boosting the station's orbital velocity for the first time, by 0.06 meter per second.[84]
9 November 17, 2018
09:01
Antares 230 MARS Pad 0A Cygnus (enhanced) CRS NG-10
John Young
3,416 kg
(7,531 lb)
Low Earth (ISS) NGIS NASA Success
Largest number of satellites launched on a single rocket (108). Cygnus NG-10, CHEFsat 2, Kicksat 2, 104 Sprite Chipsats (deployed from Kicksat 2), MYSAT 1.
10 April 17, 2019
20:46
Antares 230 MARS Pad 0A Cygnus (enhanced) CRS NG-11
Roger Chaffee[38]
3,447 kg (7,600 lbs) Low Earth (ISS) NGIS NASA Success
Launched the last mission under the Commercial Resupply Services-1 for Cygnus.[38]
11 November 2, 2019
13:59
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-12
Alan Bean[85]
3,728 kg (8,221 lbs) Low Earth (ISS) NGIS NASA Success
Cygnus NG-12 is the first mission under the NASA Commercial Resupply Services-2 contract. NG-12 is also the first to use upgraded launcher, Antares 230+.
12 February 15, 2020
20:21
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-13
Robert Lawrence, Jr.
3,377 kg (7,445 lbs) Low Earth (ISS) NGIS NASA Success
13 October 3, 2020
01:16
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-14
Kalpana Chawla
3,458 kg (7,624 lbs)[86] Low Earth (ISS) NGIS NASA Success
Spacecraft carried ISS hardware, crew supplies, and scientific payloads, including a new toilet (Universal Waste Management System, UWMS), Ammonia Electrooxidation, radishes for Plant Habitat-02, drugs for targeted cancer treatments with Onco-Selectors, and a customized 360-degree camera to capture future spacewalks.[87][86]
14 February 20, 2021
17:36
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-15
Katherine Johnson
3,810 kg (8399 lbs)[88] Low Earth (ISS) NGIS NASA Success
This mission carried over 8,000 pounds of cargo including roundworms to study muscle loss and the Spaceborne Computer 2, as well as an experiment to study the protein-based manufacturing of artificial retinas.[89]
15 August 10, 2021
22:01
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-16
Ellison Onizuka
3,723 kg (8210 lbs)[90] Low Earth (ISS) NGIS NASA Success
16 February 19, 2022
17:40
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-17
Piers Sellers
3,800 kg (8,400 lb)[91] Low Earth (ISS) NGIS NASA Success
17 November 7, 2022
10:32
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-18
Sally Ride
3,652 kg (8,051 lb)[92] Low Earth (ISS) NGIS NASA Success
18 August 2, 2023
00:31
Antares 230+ MARS Pad 0A Cygnus (enhanced) CRS NG-19
Laurel Clark
3,729 kg (8,221 lb)[93] Low Earth (ISS) NGIS NASA Success
Final Antares 230+ launch.
Close

Note: Cygnus CRS OA-4, the first Enhanced Cygnus mission, and Cygnus OA-6 were propelled by Atlas V 401 launch vehicles while the new Antares 230 was in its final stages of development. Cygnus CRS OA-7 was also switched to an Atlas V 401 and launched on April 18, 2017

    Future launches

    More information Date / time (UTC), Rocket variant ...
    Date / time (UTC) Rocket variant Launch site Payload Orbit User
    August 2025[94] Antares 330 MARS Pad 0A Cygnus (enhanced) CRS NG-23 Low Earth (ISS) NASA
    First flight of the Antares 330.
    January 2026[95] Antares 330 MARS Pad 0A Cygnus (enhanced) CRS NG-24 Low Earth (ISS) NASA
    Second flight of the Antares 330.
    2026[96] Antares 330 MARS Pad 0A Cygnus (enhanced) CRS NG-25 Low Earth (ISS) NASA
    Third flight of the Antares 330.
    Close

    Note: Cygnus NG-20 was, Cygnus NG-21 and Cygnus NG-22 will be propelled by Falcon 9 Block 5 launch vehicles while the new Antares 330 is in development.

    Launch sequence

    The following table shows a typical launch sequence of Antares-100 series rockets, such as for launching a Cygnus spacecraft on a cargo resupply mission to the International Space Station.[69] The coast phase is required because the solid-fuel upper stage has a short burn time.[97]

    More information Mission time, Event ...
    Mission timeEventAltitude
    T− 03:50:00Launch management call to stations
    T− 03:05:00Poll to initiate liquid oxygen loading system chilldown
    T− 01:30:00Poll for readiness to initiate propellant loading
    T− 00:15:00Cygnus/payload switched to internal power
    T− 00:12:00Poll for final countdown and MES medium flow chilldown
    T− 00:11:00Transporter-Erector-Launcher (TEL) armed for rapid retract
    T− 00:05:00Antares avionics switched to internal power
    T− 00:03:00Auto-sequence start (terminal count)
    T− 00:02:00Pressurize propellant tanks
    T− 00:00:00Main engine ignition
    T+ 00:00:02.1Liftoff0
    T+ 00:03:55Main engine cut-off (MECO)102 km (63 mi)
    T+ 00:04:01Stage one separation108 km (67 mi)
    T+ 00:05:31Fairing separation168 km (104 mi)
    T+ 00:05:36Interstage separation170 km (106 mi)
    T+ 00:05:40Stage two ignition171 km (106 mi)
    T+ 00:07:57Stage two burnout202 km (126 mi)
    T+ 00:09:57Payload separation201 km (125 mi)
    Close

    See also

    References

    Wikiwand in your browser!

    Seamless Wikipedia browsing. On steroids.

    Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

    Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.