The Tseung Kwan O-Lam Tin Tunnel (Chinese: 將軍澳-藍田隧道) is a tunnel in Hong Kong that is part of Route 6.[1] Originally expected to open in 2021, its opening was delayed to 11 December 2022 due to the worldwide outbreak of COVID-19.[2][3][4][5]

Quick Facts Overview, Location ...
Tseung Kwan O–Lam Tin Tunnel
將軍澳-藍田隧道
Thumb
Tiu Keng Leng portal of Tseung Kwan O - Lam Tin Tunnel.
Overview
LocationUnder Chiu Keng Wan Shan
StatusIn service
Route Route 6
StartTiu Keng Leng
EndLam Tin
Operation
Constructed9 December 2016; 7 years ago (2016-12-09)
Opened11 December 2022; 22 months ago (2022-12-11)
OwnerHong Kong Government
OperatorGreater Lucky (H.K.) Co., Ltd
TrafficVehicular
TollNo
Technical
Length2.2 kilometres (1.4 mi)
No. of lanes4 lanes (2 lanes per direction)
Operating speed80 kilometres per hour (50 mph)
Close

The tunnel connects Lam Tin to the Tseung Kwan O New Town. The eastern edge of the tunnel project connects directly with the Cross Bay Link to LOHAS Park.

See also

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.