Leibstadt Nuclear Power Plant
Nuclear power plant in Aargau, Switzerland From Wikipedia, the free encyclopedia
The Leibstadt Nuclear Power Plant (German: Kernkraftwerk Leibstadt, KKL) is located near Leibstadt, canton of Aargau, Switzerland, on the Rhine and close to the border with Germany. Commissioned in 1984, it is the youngest and most powerful of the country's four operating reactors.
This article needs additional citations for verification. (January 2017) |
Leibstadt Nuclear Power Plant | |
---|---|
Country | Switzerland |
Coordinates | 47°36′11″N 8°11′05″E |
Status | Operational |
Construction began | 1972 |
Commission date | May 24, 1984 |
Operator | Kernkraftwerk Leibstadt AG |
Nuclear power station | |
Reactor type | BWR |
Cooling towers | 1 |
Cooling source | Rhine River |
Power generation | |
Units operational | 1 × 1,220 MW |
Nameplate capacity | 1,220 MW |
Capacity factor | 87.6% |
Annual net output | 9,367 GW·h |
External links | |
Website | www |
Commons | Related media on Commons |
Its General Electric-built boiling water reactor produces 1,220 MW of electrical power. The nuclear power station has produced approximately 8.5 TWh per year, slightly less than the Goesgen Nuclear Power Plant.
It is owned by Leibstadt AG (KKL), a consortium of six Swiss energy companies: the Aare Tessin AG for electricity (Atel) with 27%, the northeast power stations AG (NOK) with 23%, the central-Swiss power stations AG (CKW) with 14%, the electricity company Laufenburg AG (EGL) with 16%, the Bern power stations AG (BKW FMB energy AG) with 10% and the Aargauer of power stations AG (AEW energy AG) with 5%. The management was originally by EGL, but with establishment of the Axpo it was consolidated within the Axpo group, so today the NOK is the manager. The plant also houses a 380 kV switchyard for the Beznau Nuclear Power Plant.
Planning for the KKL began in 1964 for a 600 MW reactor. The Swiss Federal Council opposed direct cooling by river water, replaced in the design in 1971 with a cooling tower. During further planning the output was increased to 900 and then 1200 MW. In the wake of the 1979 Three Mile Island accident new safety regulations were implemented, delaying completion for several years. The 2 billion Swiss franc construction budget spiraled to over 5 billion before the plant opened in 1984 after eleven years of construction.
With the installation of a new low-pressure turbine in 2010 Leibstadt, achieved an increase of 40 megawatts. A new 420 tonne generator,[1] the heaviest AIL to be carried on Switzerland's roads, significantly improved the power plants performance.
The history of the completion of the KKL reflected increasingly critical attitudes toward nuclear power in Switzerland during the 1970s and 1980s, which culminated in the resistance against the Kaiseraugst Nuclear Power Plant.
Nuclear events
Gallery
- In construction
- Aerial view
See also
References
External links
Wikiwand in your browser!
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.