The Mühldorf–Pilsting railway runs mainly through the province of Lower Bavaria in Germany, but part of the line crosses into Upper Bavaria as well. It was opened in 1875 by the Bavarian Eastern Railway Company (the Ostbahn) as part of the route between Mühldorf and Plattling, and was taken over by the Royal Bavarian State Railways on 1 January 1876. Whilst the southern section of the route from Mühldorf to Neumarkt-Sankt Veit became an important regional transport link as a result of the branches to Landshut and Passau at Neumarkt-Sankt Veit, the remaining section of the line never achieved its expected significance. Since 1970 only goods trains have worked between Neumarkt-Sankt Veit and Frontenhausen-Marklkofen, the adjoining section to Pilsting was closed entirely in 1969.
Quick Facts Overview, Line number ...
Mühldorf (Oberbay)–Pilsting |
---|
|
|
Line number | 5700 |
---|
|
Route number | 945 (formerly 427h, 427n, 943) |
---|
|
Line length | 59.4 km (36.9 mi) |
---|
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61,7 |
Mühldorf |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
64,5 |
Frixing block post |
|
|
|
68,4 |
Rohrbach (Oberbay) |
415 m above NN |
|
|
|
72,8 |
Taibrechting block post |
|
|
|
77,3 |
Neumarkt-Sankt Veit |
446 m above NN |
|
|
|
|
|
|
|
|
79,5 |
|
|
|
|
83,4 |
Thambach |
|
|
|
88,3 |
Gangkofen |
448 m above NN |
|
|
|
94,0 |
Trennbach |
474 m above NN |
|
|
|
102,7 |
Frontenhausen-Marklkofen |
408 m above NN |
|
|
|
104,4 |
Poxau |
|
|
|
106,8 |
Steinberg-Warth |
|
|
|
110,4 |
Griesbach b. Dingolfing |
|
|
|
117,0 |
Mamming |
|
|
|
|
|
|
|
|
121,1 |
Pilsting |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Close