![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/1/12/0332_entering_Kuanping_Bridge_%252820230722103904%2529.jpg/640px-0332_entering_Kuanping_Bridge_%252820230722103904%2529.jpg&w=640&q=50)
Line 3 (Changchun Rail Transit)
Light rail line in China / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Line 3, Changchun Rail Transit?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006[1] and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.
Quick Facts Overview, Status ...
Line 3 | |
---|---|
![]() | |
![]() A train entering Kuanping Bridge station | |
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini |
|
Stations | 34 |
Service | |
Type | Light Rail |
System | Changchun Rail Transit |
Services | 2 |
Operator(s) | Changchun Rail Transit Corporation |
Depot(s) | Huguang Road Depot Ski Resort Depot |
Rolling stock | Changchun Light Rail:3000/3500 Stock/4000 Stock |
History | |
Opened | 30 October 2002; 21 years ago (2002-10-30) |
Technical | |
Line length | 34.3 km (21.31 mi) |
Number of tracks | 2 |
Character | Underground, at-grade and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead line, 750 V DC |
Operating speed | 70 km/h |
Close