Irvington is a planned Bay Area Rapid Transit (BART) infill station in the Irvington District of Fremont, California.[3] As of November 2023[update], estimates from the city anticipated construction to begin in mid-2026, with the station opening for service in 2031.[4]
General information | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Osgood Road at Washington Boulevard Fremont, California | ||||||||||||||
Coordinates | 37.5318°N 121.9537°W | ||||||||||||||
Platforms | 2 side platforms[1][2] | ||||||||||||||
Tracks | 2 | ||||||||||||||
Construction | |||||||||||||||
Structure type | At-grade | ||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Status | design stage | ||||||||||||||
History | |||||||||||||||
Opening | 2031 | (proposed)||||||||||||||
Proposed services | |||||||||||||||
| |||||||||||||||
|
The station has been planned since it was studied as part of the Warm Springs extension in 1979, and its construction was approved by the BART board in 1992.[5]
The Warm Springs extension began construction through the Irvington District in 2009,[6] to connect Fremont and Warm Springs. The proposed station at the center of Irvington, once considered optional, was part of the extension.[7] However funding for construction of the station fell through. The station had been envisioned for completion in 2015.[8] Provisions for personnel access and preliminary foundation work were included when track was laid through the site.[2]
The city of Fremont had planned to finance the $140 million station through redevelopment agency bonds in 2009, but the bonds were cancelled when the California State Legislature abolished the redevelopment agency.[9][10] In 2014,[5] Measure BB and the Alameda County Transportation Expenditure Plan received voter approval with $120 million listed for the Irvington BART station that was contingent on full definition of the capital project and its inclusion in a future Capital Improvement Program.[11][12] A reevaluation of the environmental impact study was undertaken by the city in 2017.[13]
The BART Board of Directors confirmed they had voted to authorize the Irvington station in August 2019,[14] with construction to start in August 2022 and complete by August 2026.[15] As of November 2023, the start of construction was pushed back to mid-2026 and the station opening to 2031.[4]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.