![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/8/82/Fahrettin_Altay_metro_station.jpg/640px-Fahrettin_Altay_metro_station.jpg&w=640&q=50)
Fahrettin Altay (İzmir Metro)
From Wikipedia, the free encyclopedia
Fahrettin Altay is an underground station of the İzmir Metro's only operating line, the M1. Located under Fahrettin Altay square, the station has two side platforms servicing two tracks. The station was opened on 26 July 2014, after 9 years of delayed construction. The station was a terminal station from 2014 to 2024, until line extended to Narlıdere.
Quick Facts General information, Location ...
Fahrettin Altay | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
İzmir Metro rapid transit station | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Location | Fahrettin Altay Meydanı, Fahrettin Altay Mah., 35140 Karabağlar | ||||||||||
Coordinates | 38.3971°N 27.0700°E / 38.3971; 27.0700 | ||||||||||
Owned by | İzmir Metropolitan Municipality | ||||||||||
Operated by | İzmir Metro A.Ş. | ||||||||||
Line(s) | |||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() ![]() | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 26 July 2014; 9 years ago (2014-07-26) | ||||||||||
Electrified | 750V DC Third rail | ||||||||||
Services | |||||||||||
| |||||||||||
Close
The station offers connections to regional buses to Çeşme, Urla, Seferihisar and Karaburun, which depart from a terminal within walking distance to Fahrettin Altay square.