Abbeville Southern Railway
From Wikipedia, the free encyclopedia
The Abbeville Southern Railway was incorporated in Alabama in September 1892 for the purpose of building a railroad line from Grimes, Alabama northeast to Abbeville, Alabama. The route was completed in December 1893, totaling 26.9 miles (43.3 km), and was operated by the Alabama Midland Railway.
Quick Facts Overview, Locale ...
Overview | |
---|---|
Locale | Southern Alabama |
Dates of operation | 1893–1902 |
Successor | Alabama Midland Railway Plant System Atlantic Coast Line Railroad Seaboard Coast Line Railroad CSX Transportation Abbeville–Grimes Railway Company Bay Line Railroad |
Technical | |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
Length | 26.9 miles (43.3 km) |
Close