Tehran–Qom–Isfahan high-speed rail
High-speed rail project in Iran / From Wikipedia, the free encyclopedia
Tehran–Qom–Isfahan high-speed rail is the first truly high-speed rail project in Iran. Construction began on 25 February 2015.[3][1][4] The rail line would decrease travel times between Tehran and Isfahan, passing through Qom. It connects Isfahan and Qom to Imam Khomeini International Airport.[5]
Quick Facts Ministry, Budget ...
Tehran–Qom–Isfahan high-speed rail | |
---|---|
Ministry | Minister of road and urban development |
Budget | 48 billion Yuan or 57 billion Yuan |
Close
Quick Facts Overview, Native name ...
Tehran–Qom–Isfahan high-speed rail | |||
---|---|---|---|
Overview | |||
Native name | راه آهن تندرو تهران-قم-اصفهان | ||
Status | Under construction | ||
Owner | Islamic Republic of Iran Railways | ||
Locale | Tehran Province, Qom Province, Isfahan Province Iran | ||
Termini | |||
Stations | 4 (Planned) | ||
Service | |||
Type | High-speed rail | ||
Technical | |||
Line length | 410 km (250 mi)[1] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | Overhead catenary | ||
Operating speed | 300 km/h[2] | ||
|
Close
Tehran-Qom-Isfahan High Speed Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The project is implemented by a Chinese consortium led by the China Railway Engineering Corporation.[1] Completion was planned in 2021.[3] In June 2022, the high speed rail line was not operating, but a spokesperson said that it will be operational within the end of the 13th Government, which is the Government of Ebrahim Raisi, elected in 2021. Therefore, the railway should become operational in around 2025. [6]