Kathmandu–Terai Expressway
Under construction road in Nepal / From Wikipedia, the free encyclopedia
Kathmandu–Terai/Madhesh Expressway or NH33 (previously: H20) (Nepali: काठमाडौँ तराई द्रुतमार्ग), also known as Fast Track, is an under construction road connecting Kathmandu and Nijgadh in southern Terai region of Nepal.[1] The road is 70.977 kilometres (44.103 mi) long, of which, 48.037 kilometres (29.849 mi) is normal roads, 12.885 kilometres (8.006 mi) is bridges and 10.055 kilometres (6.248 mi) is tunnels. The expressway is being constructed by Nepal Army, originally scheduled to be completed by September 2021.[2] The new set target date for completion is 2026.[3] As of June 2024, around 30% of the work has been completed.
Kathmandu–Terai/ Madhesh Expressway काठमाडौं तराई मधेश द्रुतमार्ग | ||||
---|---|---|---|---|
राष्ट्रिय राजमार्ग ३३ | ||||
National Highway 34 | ||||
Route information | ||||
Maintained by MoPIT (Department of Roads) | ||||
Length | 71 km (44 mi) | |||
Major junctions | ||||
From | Kathmandu, Nepal | |||
To | Nijgadh, Nepal | |||
Location | ||||
Country | Nepal | |||
Highway system | ||||
|
The consulting service for the construction is provided by Yooshin Engineering, a Korean firm.[4] The most complicated section, including the tunnels and several bridges will be constructed by Chinese companies China State Construction Engineering and Poly Changda Engineering.[5]